Engineer A Specialized Subconsultant Engagement Recommendation Tidal Crossing

O · Obligation Individual
http://proethica.org/ontology/case/88#Engineer_A_Specialized_Subconsultant_Engagement_Recommendation_Tidal_Crossing
Properties
Instance of
SpecializedSubconsultantEngagementRecommendationObligation
http://proethica.org/ontology/intermediate#SpecializedSubconsultantEngagementRecommendationObligation
Case context
Engineer A has proposed a specialized subconsultant to conduct complex hydrologic and hydraulic analysis predicting flood damage to twenty upstream homes, but Client B has directed Engineer A to proceed without the analysis unless regulators request it.
Compliance status
partial
Confidence
0.93
Importance
high
Obligated party
Engineer A
Obligation statement
Engineer A is obligated to formally recommend in writing to Client B the engagement of a specialized hydrologic and hydraulic subconsultant to conduct the complex analysis needed to predict flood damage to upstream homes, and to document that recommendation so that Client B cannot later claim ignorance of the technical gap.
Temporal scope
Before proceeding with design and permitting without the specialized analysis
Source Evidence
Source text
Engineer A proposes a complex and costly hydrologic and hydraulic analysis by a specialized subconsultant to predict the extent to which sea level rise and the increased hydraulic capacity of the tidal crossing will result in flood damage to a neighborhood of twenty upstream homes during future high tides and storm surges

Text references
Client B directs Engineer A to proceed without the costly analysis unless and until such an analysis is requested by the applicable regulatory authorities.
Engineer A proposes a complex and costly hydrologic and hydraulic analysis by a specialized subconsultant to predict the extent to which sea level rise and the increased hydraulic capacity of the tidal crossing will result in flood damage to a neighborhood of twenty upstream homes during future high tides and storm surges
TTL
@prefix case88: <http://proethica.org/ontology/case/88#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case88:Engineer_A_Specialized_Subconsultant_Engagement_Recommendation_Tidal_Crossing a proeth:SpecializedSubconsultantEngagementRecommendationObligation, owl:NamedIndividual ; rdfs:label "Engineer A Specialized Subconsultant Engagement Recommendation Tidal Crossing" ; proeth-core:defeasibleUnder case88:Resource_Constraint_-_Specialized_Subconsultant_Analysis ; proeth:casecontext "Engineer A has proposed a specialized subconsultant to conduct complex hydrologic and hydraulic analysis predicting flood damage to twenty upstream homes, but Client B has directed Engineer A to proceed without the analysis unless regulators request it." ; proeth:compliancestatus "partial" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.93" ; proeth:derivedFromPrinciple case88:Professional_Competence_in_Risk_Assessment_Invoked_By_Engineer_A_Hydraulic_Evaluation ; proeth:discoveredincase "88" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-27T14:13:00.331319+00:00" ; proeth:firstdiscoveredincase "88" ; proeth:generatedattime "2026-02-27T14:13:00.331319+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Engineer A" ; proeth:obligationclass "Specialized Subconsultant Engagement Recommendation Obligation" ; proeth:obligationstatement "Engineer A is obligated to formally recommend in writing to Client B the engagement of a specialized hydrologic and hydraulic subconsultant to conduct the complex analysis needed to predict flood damage to upstream homes, and to document that recommendation so that Client B cannot later claim ignorance of the technical gap." ; proeth:sourcetext "Engineer A proposes a complex and costly hydrologic and hydraulic analysis by a specialized subconsultant to predict the extent to which sea level rise and the increased hydraulic capacity of the tidal crossing will result in flood damage to a neighborhood of twenty upstream homes during future high tides and storm surges" ; proeth:temporalscope "Before proceeding with design and permitting without the specialized analysis" ; proeth:textreferences "Client B directs Engineer A to proceed without the costly analysis unless and until such an analysis is requested by the applicable regulatory authorities.", "Engineer A proposes a complex and costly hydrologic and hydraulic analysis by a specialized subconsultant to predict the extent to which sea level rise and the increased hydraulic capacity of the tidal crossing will result in flood damage to a neighborhood of twenty upstream homes during future high tides and storm surges" ; proeth:wasattributedto "Case 88 Extraction" ; prov:generatedAtTime "2026-02-28T10:32:26.865708"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 88 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
88
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-27T14:13:00.331319+00:00
First case
88
Generated
2026-02-27T14:13:00.331319+00:00
Attributed to
Case 88 Extraction
Generated
2026-02-28T10:32:26.865708
Generated by
ProEthica Case 88 Extraction