Engineer A Public Hearing Climate Risk Information Gap Remediation Tidal Crossing

O · Obligation Individual
http://proethica.org/ontology/case/88#Engineer_A_Public_Hearing_Climate_Risk_Information_Gap_Remediation_Tidal_Crossing
Properties
Instance of
PublicHearingClimateRiskInformationGapRemediationObligation
http://proethica.org/ontology/intermediate#PublicHearingClimateRiskInformationGapRemediationObligation
Case context
Engineer A anticipates that the flood risk to upstream homes will be a difficult question to answer in public hearings, and Client B has directed Engineer A to forgo the analysis needed to answer it — creating a foreseeable information gap in the regulatory process.
Compliance status
unmet
Confidence
0.87
Importance
high
Obligated party
Engineer A
Obligation statement
Engineer A is obligated to ensure that the public regulatory hearing process for the tidal crossing upgrade is not conducted with a foreseeable and preventable climate risk information gap regarding flood impacts on upstream homeowners, either by obtaining Client B's authorization for the specialized analysis, proposing a written risk disclosure report for regulatory consideration, or escalating to regulatory authorities independently if those avenues are foreclosed.
Temporal scope
Before and during the public hearing process for the tidal crossing upgrade permit
Source Evidence
Source text
anticipating this to be a difficult question to answer in the project's public hearings

Text references
Client B directs Engineer A to proceed without the costly analysis unless and until such an analysis is requested by the applicable regulatory authorities.
anticipating this to be a difficult question to answer in the project's public hearings
TTL
@prefix case88: <http://proethica.org/ontology/case/88#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case88:Engineer_A_Public_Hearing_Climate_Risk_Information_Gap_Remediation_Tidal_Crossing a proeth:PublicHearingClimateRiskInformationGapRemediationObligation, owl:NamedIndividual ; rdfs:label "Engineer A Public Hearing Climate Risk Information Gap Remediation Tidal Crossing" ; proeth-core:defeasibleUnder <http://proethica.org/ontology/case/88#Client-Directed_Deferral_of_Third-Party_Risk_Analysis_—_Upstream_Flood_Study> ; proeth:casecontext "Engineer A anticipates that the flood risk to upstream homes will be a difficult question to answer in public hearings, and Client B has directed Engineer A to forgo the analysis needed to answer it — creating a foreseeable information gap in the regulatory process." ; proeth:compliancestatus "unmet" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.87" ; proeth:derivedFromPrinciple case88:Proactive_Risk_Disclosure_Invoked_By_Engineer_A_Upstream_Flood ; proeth:discoveredincase "88" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-27T14:13:00.331319+00:00" ; proeth:firstdiscoveredincase "88" ; proeth:generatedattime "2026-02-27T14:13:00.331319+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Engineer A" ; proeth:obligationclass "Public Hearing Climate Risk Information Gap Remediation Obligation" ; proeth:obligationstatement "Engineer A is obligated to ensure that the public regulatory hearing process for the tidal crossing upgrade is not conducted with a foreseeable and preventable climate risk information gap regarding flood impacts on upstream homeowners, either by obtaining Client B's authorization for the specialized analysis, proposing a written risk disclosure report for regulatory consideration, or escalating to regulatory authorities independently if those avenues are foreclosed." ; proeth:sourcetext "anticipating this to be a difficult question to answer in the project's public hearings" ; proeth:temporalscope "Before and during the public hearing process for the tidal crossing upgrade permit" ; proeth:textreferences "Client B directs Engineer A to proceed without the costly analysis unless and until such an analysis is requested by the applicable regulatory authorities.", "anticipating this to be a difficult question to answer in the project's public hearings" ; proeth:wasattributedto "Case 88 Extraction" ; prov:generatedAtTime "2026-02-28T10:32:26.858136"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 88 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
88
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-27T14:13:00.331319+00:00
First case
88
Generated
2026-02-27T14:13:00.331319+00:00
Attributed to
Case 88 Extraction
Generated
2026-02-28T10:32:26.858136
Generated by
ProEthica Case 88 Extraction