Engineer A Formal Client Project Failure Risk Notification Tidal Crossing

O · Obligation Individual
http://proethica.org/ontology/case/88#Engineer_A_Formal_Client_Project_Failure_Risk_Notification_Tidal_Crossing
Properties
Instance of
FormalClientProjectFailureRiskNotificationObligation
http://proethica.org/ontology/intermediate#FormalClientProjectFailureRiskNotificationObligation
Case context
Client B has directed Engineer A to proceed without the specialized analysis, and Engineer A must formally document in writing that this approach will not achieve the project's public safety objectives with respect to upstream flood risk.
Compliance status
unmet
Confidence
0.9
Importance
high
Obligated party
Engineer A
Obligation statement
Engineer A is obligated to formally advise Client B in writing that, in Engineer A's professional judgment, proceeding without the specialized hydrologic and hydraulic analysis will result in a project that fails to protect the public from material flood risk to twenty upstream homes, so that Client B has clear written notice of Engineer A's professional assessment.
Temporal scope
Upon Client B's directive to forgo the specialized analysis and before proceeding with design and permitting
Source Evidence
Source text
Client B directs Engineer A to proceed without the costly analysis unless and until such an analysis is requested by the applicable regulatory authorities.

Text references
Client B directs Engineer A to proceed without the costly analysis unless and until such an analysis is requested by the applicable regulatory authorities.
It is Engineer A's judgment, based on hydraulic evaluation procedures presented at a recent transportation agency conference, that the proposed project may result in some upstream homes becoming uninhabitable a decade or more earlier than would otherwise be the case.
TTL
@prefix case88: <http://proethica.org/ontology/case/88#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case88:Engineer_A_Formal_Client_Project_Failure_Risk_Notification_Tidal_Crossing a proeth:FormalClientProjectFailureRiskNotificationObligation, owl:NamedIndividual ; rdfs:label "Engineer A Formal Client Project Failure Risk Notification Tidal Crossing" ; proeth-core:defeasibleUnder <http://proethica.org/ontology/case/88#Client-Directed_Deferral_of_Third-Party_Risk_Analysis_—_Upstream_Flood_Study> ; proeth:casecontext "Client B has directed Engineer A to proceed without the specialized analysis, and Engineer A must formally document in writing that this approach will not achieve the project's public safety objectives with respect to upstream flood risk." ; proeth:compliancestatus "unmet" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.9" ; proeth:derivedFromPrinciple case88:Faithful_Agent_Notification_Invoked_By_Engineer_A_Client_B ; proeth:discoveredincase "88" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-27T14:13:00.331319+00:00" ; proeth:firstdiscoveredincase "88" ; proeth:generatedattime "2026-02-27T14:13:00.331319+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Engineer A" ; proeth:obligationclass "Formal Client Project Failure Risk Notification Obligation" ; proeth:obligationstatement "Engineer A is obligated to formally advise Client B in writing that, in Engineer A's professional judgment, proceeding without the specialized hydrologic and hydraulic analysis will result in a project that fails to protect the public from material flood risk to twenty upstream homes, so that Client B has clear written notice of Engineer A's professional assessment." ; proeth:sourcetext "Client B directs Engineer A to proceed without the costly analysis unless and until such an analysis is requested by the applicable regulatory authorities." ; proeth:temporalscope "Upon Client B's directive to forgo the specialized analysis and before proceeding with design and permitting" ; proeth:textreferences "Client B directs Engineer A to proceed without the costly analysis unless and until such an analysis is requested by the applicable regulatory authorities.", "It is Engineer A's judgment, based on hydraulic evaluation procedures presented at a recent transportation agency conference, that the proposed project may result in some upstream homes becoming uninhabitable a decade or more earlier than would otherwise be the case." ; proeth:wasattributedto "Case 88 Extraction" ; prov:generatedAtTime "2026-02-28T10:32:26.856849"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 88 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
88
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-27T14:13:00.331319+00:00
First case
88
Generated
2026-02-27T14:13:00.331319+00:00
Attributed to
Case 88 Extraction
Generated
2026-02-28T10:32:26.856849
Generated by
ProEthica Case 88 Extraction