Case context
The proposed tidal crossing upgrade benefits the healthcare facility developer while imposing accelerated flood risk on an upstream residential community of approximately twenty homes.
Compliance status
unclear
Confidence
0.84
Importance
high
Obligated party
Engineer A
Obligation statement
Engineer A was obligated to disclose to Client B and the applicable regulatory authority that the proposed tidal crossing upgrade would disproportionately impose accelerated flood risk and potential uninhabitability on the approximately twenty upstream homeowners — a specific identifiable community bearing the negative externalities of a development that benefits a different party — including the probability, magnitude, and distributional inequity of that risk.
Temporal scope
Upon identifying the disproportionate impact on upstream homeowners, before and during regulatory permitting
Relationships
defeasibleUnder
Foreseeable Third-Party Harm from Hydraulic Capacity Increase — Upstream Neighborhood
derivedFromPrinciple
Public Welfare Paramount Invoked By Engineer A Tidal Crossing
Source Evidence
Source text
It is Engineer A's judgment, based on hydraulic evaluation procedures presented at a recent transportation agency conference, that the proposed project may result in some upstream homes becoming uninhabitable a decade or more earlier than would otherwise be the case.
Text references
Engineer A proposes a complex and costly hydrologic and hydraulic analysis by a specialized subconsultant to predict the extent to which sea level rise and the increased hydraulic capacity of the tidal crossing will result in flood damage to a neighborhood of twenty upstream homes during future high tides and storm surges
It is Engineer A's judgment, based on hydraulic evaluation procedures presented at a recent transportation agency conference, that the proposed project may result in some upstream homes becoming uninhabitable a decade or more earlier than would otherwise be the case.
TTL
@prefix case88: <http://proethica.org/ontology/case/88#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case88:Engineer_A_Environmental_Justice_Risk_Disclosure_Upstream_Homes a proeth:EnvironmentalJusticeRiskDisclosureObligation,
owl:NamedIndividual ;
rdfs:label "Engineer A Environmental Justice Risk Disclosure Upstream Homes" ;
proeth-core:defeasibleUnder <http://proethica.org/ontology/case/88#Foreseeable_Third-Party_Harm_from_Hydraulic_Capacity_Increase_—_Upstream_Neighborhood> ;
proeth:casecontext "The proposed tidal crossing upgrade benefits the healthcare facility developer while imposing accelerated flood risk on an upstream residential community of approximately twenty homes." ;
proeth:compliancestatus "unclear" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.84" ;
proeth:derivedFromPrinciple case88:Public_Welfare_Paramount_Invoked_By_Engineer_A_Tidal_Crossing ;
proeth:discoveredincase "88" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-26T00:15:23.499283+00:00" ;
proeth:firstdiscoveredincase "88" ;
proeth:generatedattime "2026-02-26T00:15:23.499283+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer A" ;
proeth:obligationclass "Environmental Justice Risk Disclosure Obligation" ;
proeth:obligationstatement "Engineer A was obligated to disclose to Client B and the applicable regulatory authority that the proposed tidal crossing upgrade would disproportionately impose accelerated flood risk and potential uninhabitability on the approximately twenty upstream homeowners — a specific identifiable community bearing the negative externalities of a development that benefits a different party — including the probability, magnitude, and distributional inequity of that risk." ;
proeth:sourcetext "It is Engineer A's judgment, based on hydraulic evaluation procedures presented at a recent transportation agency conference, that the proposed project may result in some upstream homes becoming uninhabitable a decade or more earlier than would otherwise be the case." ;
proeth:temporalscope "Upon identifying the disproportionate impact on upstream homeowners, before and during regulatory permitting" ;
proeth:textreferences "Engineer A proposes a complex and costly hydrologic and hydraulic analysis by a specialized subconsultant to predict the extent to which sea level rise and the increased hydraulic capacity of the tidal crossing will result in flood damage to a neighborhood of twenty upstream homes during future high tides and storm surges",
"It is Engineer A's judgment, based on hydraulic evaluation procedures presented at a recent transportation agency conference, that the proposed project may result in some upstream homes becoming uninhabitable a decade or more earlier than would otherwise be the case." ;
proeth:wasattributedto "Case 88 Extraction" ;
prov:generatedAtTime "2026-02-26T00:31:11.065096"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 88 Extraction" .
Metadata
Extraction details
Discovered in case
88
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-26T00:15:23.499283+00:00
First case
88
Generated
2026-02-26T00:15:23.499283+00:00
Attributed to
Case 88 Extraction
Generated
2026-02-26T00:31:11.065096
Generated by
ProEthica Case 88 Extraction