Engineer A Client Risk Consequence Communication Tidal Crossing

O · Obligation Individual
http://proethica.org/ontology/case/88#Engineer_A_Client_Risk_Consequence_Communication_Tidal_Crossing
Properties
Instance of
ClientRiskConsequenceCommunicationObligation
http://proethica.org/ontology/intermediate#ClientRiskConsequenceCommunicationObligation
Case context
Client B has directed Engineer A to forgo the specialized analysis on cost grounds; Engineer A must ensure Client B understands the full consequences of that decision, including risks to Client B itself, before accepting the directive.
Compliance status
unmet
Confidence
0.88
Importance
high
Obligated party
Engineer A
Obligation statement
Engineer A is obligated to communicate to Client B not only the public welfare rationale for the specialized hydrologic and hydraulic analysis but also the specific professional, legal, and reputational risks to Client B of declining to authorize the analysis — including potential liability to upstream homeowners and regulatory exposure — so that Client B can make a fully informed decision about whether to authorize the work.
Temporal scope
Upon Client B's directive to forgo the specialized analysis and before proceeding without it
Source Evidence
Source text
Client B directs Engineer A to proceed without the costly analysis unless and until such an analysis is requested by the applicable regulatory authorities.

Text references
Client B directs Engineer A to proceed without the costly analysis unless and until such an analysis is requested by the applicable regulatory authorities.
Engineer A proposes a complex and costly hydrologic and hydraulic analysis by a specialized subconsultant to predict the extent to which sea level rise and the increased hydraulic capacity of the tidal crossing will result in flood damage to a neighborhood of twenty upstream homes
TTL
@prefix case88: <http://proethica.org/ontology/case/88#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case88:Engineer_A_Client_Risk_Consequence_Communication_Tidal_Crossing a proeth:ClientRiskConsequenceCommunicationObligation, owl:NamedIndividual ; rdfs:label "Engineer A Client Risk Consequence Communication Tidal Crossing" ; proeth-core:defeasibleUnder case88:Client_B_Deferral_of_Third-Party_Risk_Analysis ; proeth:casecontext "Client B has directed Engineer A to forgo the specialized analysis on cost grounds; Engineer A must ensure Client B understands the full consequences of that decision, including risks to Client B itself, before accepting the directive." ; proeth:compliancestatus "unmet" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.88" ; proeth:derivedFromPrinciple case88:Faithful_Agent_Notification_Invoked_By_Engineer_A_Client_B ; proeth:discoveredincase "88" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-27T14:13:00.331319+00:00" ; proeth:firstdiscoveredincase "88" ; proeth:generatedattime "2026-02-27T14:13:00.331319+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Engineer A" ; proeth:obligationclass "Client Risk Consequence Communication Obligation" ; proeth:obligationstatement "Engineer A is obligated to communicate to Client B not only the public welfare rationale for the specialized hydrologic and hydraulic analysis but also the specific professional, legal, and reputational risks to Client B of declining to authorize the analysis — including potential liability to upstream homeowners and regulatory exposure — so that Client B can make a fully informed decision about whether to authorize the work." ; proeth:sourcetext "Client B directs Engineer A to proceed without the costly analysis unless and until such an analysis is requested by the applicable regulatory authorities." ; proeth:temporalscope "Upon Client B's directive to forgo the specialized analysis and before proceeding without it" ; proeth:textreferences "Client B directs Engineer A to proceed without the costly analysis unless and until such an analysis is requested by the applicable regulatory authorities.", "Engineer A proposes a complex and costly hydrologic and hydraulic analysis by a specialized subconsultant to predict the extent to which sea level rise and the increased hydraulic capacity of the tidal crossing will result in flood damage to a neighborhood of twenty upstream homes" ; proeth:wasattributedto "Case 88 Extraction" ; prov:generatedAtTime "2026-02-28T10:32:26.865100"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 88 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
88
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-27T14:13:00.331319+00:00
First case
88
Generated
2026-02-27T14:13:00.331319+00:00
Attributed to
Case 88 Extraction
Generated
2026-02-28T10:32:26.865100
Generated by
ProEthica Case 88 Extraction