Climate-Informed Design Obligation Activation — Engineer A Coastal Project

S · State Individual
http://proethica.org/ontology/case/88#Climate-Informed_Design_Obligation_Activation_—_Engineer_A_Coastal_Project
Properties
Instance of
Climate-InformedDesignObligationActivationState
http://proethica.org/ontology/intermediate#Climate-InformedDesignObligationActivationState
Active period
Activated once Engineer A forms the judgment that significant flooding risk to other properties is reasonably likely; persists until client agrees to evaluation/disclosure or Engineer A withdraws
Affected parties
Adjacent property owners
Client B
Engineer A
Future residents
Public
Regulatory agencies
Confidence
0.97
Importance
high
Subject
Engineer A's professional judgment regarding the need for detailed future-condition climate and hydraulic evaluation
Terminated by
Client B agreeing to detailed evaluation and disclosure, or Engineer A's withdrawal from the project
Triggering event
Engineer A's professional assessment that the project poses sufficient potential for flooding of other properties to merit detailed, complex evaluation of future conditions
Urgency level
high
Source Evidence
Source text
Engineer A has an obligation to consider climate and weather changes in the future with respect to potential impacts on public health, safety, and welfare, where such impacts are reasonably likely and significant

Text references
Engineer A has an obligation to consider climate and weather changes in the future with respect to potential impacts on public health, safety, and welfare, where such impacts are reasonably likely and significant
Engineer A needs to have sufficient understanding of hydrology, hydraulics, and coastal modeling to form a reasonable judgment that there is sufficient potential for flooding of other properties to merit a detailed, complex evaluation of future conditions
Engineer A should engage Client B in discussions about the need for the detailed evaluation and disclosure of the potential impacts on the public
TTL
@prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . <http://proethica.org/ontology/case/88#Climate-Informed_Design_Obligation_Activation_—_Engineer_A_Coastal_Project> a proeth:Climate-InformedDesignObligationActivationState, owl:NamedIndividual ; rdfs:label "Climate-Informed Design Obligation Activation — Engineer A Coastal Project" ; proeth:activeperiod "Activated once Engineer A forms the judgment that significant flooding risk to other properties is reasonably likely; persists until client agrees to evaluation/disclosure or Engineer A withdraws" ; proeth:affectedparties "Adjacent property owners", "Client B", "Engineer A", "Future residents", "Public", "Regulatory agencies" ; proeth:conceptCategory "State" ; proeth:confidence "0.97" ; proeth:discoveredincase "88" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-27T06:42:52.571341+00:00" ; proeth:firstdiscoveredincase "88" ; proeth:generatedattime "2026-02-27T06:42:52.571341+00:00" ; proeth:importance "high" ; proeth:sourcetext "Engineer A has an obligation to consider climate and weather changes in the future with respect to potential impacts on public health, safety, and welfare, where such impacts are reasonably likely and significant" ; proeth:stateclass "Climate-Informed Design Obligation Activation State" ; proeth:subject "Engineer A's professional judgment regarding the need for detailed future-condition climate and hydraulic evaluation" ; proeth:terminatedby "Client B agreeing to detailed evaluation and disclosure, or Engineer A's withdrawal from the project" ; proeth:textreferences "Engineer A has an obligation to consider climate and weather changes in the future with respect to potential impacts on public health, safety, and welfare, where such impacts are reasonably likely and significant", "Engineer A needs to have sufficient understanding of hydrology, hydraulics, and coastal modeling to form a reasonable judgment that there is sufficient potential for flooding of other properties to merit a detailed, complex evaluation of future conditions", "Engineer A should engage Client B in discussions about the need for the detailed evaluation and disclosure of the potential impacts on the public" ; proeth:triggeringevent "Engineer A's professional assessment that the project poses sufficient potential for flooding of other properties to merit detailed, complex evaluation of future conditions" ; proeth:urgencylevel "high" ; proeth:wasattributedto "Case 88 Extraction" ; prov:generatedAtTime "2026-02-28T10:32:26.877023"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 88 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
88
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-27T06:42:52.571341+00:00
First case
88
Generated
2026-02-27T06:42:52.571341+00:00
Attributed to
Case 88 Extraction
Generated
2026-02-28T10:32:26.877023
Generated by
ProEthica Case 88 Extraction