100-year storm surge elevation recommendation
Client A Cost-Refusing Developer
Balancing with
Client Loyalty
Concrete expression
Engineer A must document in writing the recommendation to build to the 100-year storm surge elevation, the scientific and professional basis for that recommendation, and Client A's refusal to comply, so as to create a clear and unambiguous record of Engineer A's professional judgment and the client's contrary decision
Confidence
0.89
Importance
high
Interpretation
In this context, the written documentation obligation requires Engineer A to create a formal written record of the safety recommendation and the client's refusal, both to preserve Engineer A's ability to demonstrate discharge of professional obligation and to create an actionable record that could support subsequent escalation if warranted
Invoked by
Engineer A Present Case Coastal Risk Assessment
Tension resolution
The written documentation obligation is not contingent on client agreement; Engineer A must document the recommendation and the client's refusal regardless of Client A's preferences
Source Evidence
Source text
Engineer A believes the residential development project should be built to a 100-year projected storm surge elevation, due to public safety risks even at lower projections of future surge level rise

Text references
Because of the increased cost, Owner refuses to agree that the residential development project be built to a 100-year projection storm surge elevation
Engineer A believes the residential development project should be built to a 100-year projected storm surge elevation, due to public safety risks even at lower projections of future surge level rise
TTL
@prefix case87: <http://proethica.org/ontology/case/87#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case87:Written_Documentation_Requirement_for_Safety_Notification_Invoked_By_Engineer_A a proeth:WrittenDocumentationRequirementforSafetyNotification, owl:NamedIndividual ; rdfs:label "Written Documentation Requirement for Safety Notification Invoked By Engineer A" ; proeth:appliedto "100-year storm surge elevation recommendation", "Client A Cost-Refusing Developer" ; proeth:balancingwith "Client Loyalty" ; proeth:conceptCategory "Principle" ; proeth:concreteexpression "Engineer A must document in writing the recommendation to build to the 100-year storm surge elevation, the scientific and professional basis for that recommendation, and Client A's refusal to comply, so as to create a clear and unambiguous record of Engineer A's professional judgment and the client's contrary decision" ; proeth:confidence "0.89" ; proeth:discoveredincase "87" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-27T15:35:25.619322+00:00" ; proeth:firstdiscoveredincase "87" ; proeth:generatedattime "2026-02-27T15:35:25.619322+00:00" ; proeth:importance "high" ; proeth:interpretation "In this context, the written documentation obligation requires Engineer A to create a formal written record of the safety recommendation and the client's refusal, both to preserve Engineer A's ability to demonstrate discharge of professional obligation and to create an actionable record that could support subsequent escalation if warranted" ; proeth:invokedby "Engineer A Present Case Coastal Risk Assessment" ; proeth:principleclass "Written Documentation Requirement for Safety Notification" ; proeth:sourcetext "Engineer A believes the residential development project should be built to a 100-year projected storm surge elevation, due to public safety risks even at lower projections of future surge level rise" ; proeth:tensionresolution "The written documentation obligation is not contingent on client agreement; Engineer A must document the recommendation and the client's refusal regardless of Client A's preferences" ; proeth:textreferences "Because of the increased cost, Owner refuses to agree that the residential development project be built to a 100-year projection storm surge elevation", "Engineer A believes the residential development project should be built to a 100-year projected storm surge elevation, due to public safety risks even at lower projections of future surge level rise" ; proeth:wasattributedto "Case 87 Extraction" ; prov:generatedAtTime "2026-02-27T16:34:23.734789"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 87 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
87
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-27T15:35:25.619322+00:00
First case
87
Generated
2026-02-27T15:35:25.619322+00:00
Attributed to
Case 87 Extraction
Generated
2026-02-27T16:34:23.734789
Generated by
ProEthica Case 87 Extraction