Engineer A Coastal Risk Assessment Post-Cost-Refusal Escalation Assessment

O · Obligation Individual
http://proethica.org/ontology/case/87#Engineer_A_Coastal_Risk_Assessment_Post-Cost-Refusal_Escalation_Assessment
Properties
Instance of
Post-Cost-RefusalStormSurgeEscalationAssessmentObligation
http://proethica.org/ontology/intermediate#Post-Cost-RefusalStormSurgeEscalationAssessmentObligation
Case context
Client A refused to build to the 100-year storm surge standard on cost grounds; Engineer A must assess whether withdrawal alone is sufficient or whether escalation to authorities is required
Compliance status
unclear
Confidence
0.86
Importance
high
Obligated party
Engineer A (coastal risk assessment, present case)
Obligation statement
After Client A refused to accept the 100-year storm surge elevation standard, Engineer A was obligated to assess whether the nature, probability, and severity of the identified storm surge risk — including the risk to future residents of the coastal residential development and the general public — was sufficiently serious to require escalation beyond the client relationship to local government officials, regulatory authorities, or the public.
Temporal scope
Upon Client A's refusal to accept the 100-year storm surge elevation standard and upon or after withdrawal from the project
Source Evidence
Source text
If Client A refuses to agree with Engineer A's design standard, Engineer A should withdraw from the project.

Text references
Engineer A should also consider contacting local government officials to advocate for the implementation of appropriate and updated region-wide building codes in all jurisdictions for the geographical area where or near where the residential development project is being built.
If Client A refuses to agree with Engineer A's design standard, Engineer A should withdraw from the project.
TTL
@prefix case87: <http://proethica.org/ontology/case/87#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case87:Engineer_A_Coastal_Risk_Assessment_Post-Cost-Refusal_Escalation_Assessment a proeth:Post-Cost-RefusalStormSurgeEscalationAssessmentObligation, owl:NamedIndividual ; rdfs:label "Engineer A Coastal Risk Assessment Post-Cost-Refusal Escalation Assessment" ; proeth-core:defeasibleUnder case87:Client_A_Cost-Based_Refusal_of_100-Year_Storm_Surge_Standard ; proeth:casecontext "Client A refused to build to the 100-year storm surge standard on cost grounds; Engineer A must assess whether withdrawal alone is sufficient or whether escalation to authorities is required" ; proeth:compliancestatus "unclear" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.86" ; proeth:derivedFromPrinciple case87:Post-Client-Refusal_Escalation_Assessment_Obligation_Invoked_By_Engineer_A ; proeth:discoveredincase "87" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-27T15:43:01.811893+00:00" ; proeth:firstdiscoveredincase "87" ; proeth:generatedattime "2026-02-27T15:43:01.811893+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Engineer A (coastal risk assessment, present case)" ; proeth:obligationclass "Post-Cost-Refusal Storm Surge Escalation Assessment Obligation" ; proeth:obligationstatement "After Client A refused to accept the 100-year storm surge elevation standard, Engineer A was obligated to assess whether the nature, probability, and severity of the identified storm surge risk — including the risk to future residents of the coastal residential development and the general public — was sufficiently serious to require escalation beyond the client relationship to local government officials, regulatory authorities, or the public." ; proeth:sourcetext "If Client A refuses to agree with Engineer A's design standard, Engineer A should withdraw from the project." ; proeth:temporalscope "Upon Client A's refusal to accept the 100-year storm surge elevation standard and upon or after withdrawal from the project" ; proeth:textreferences "Engineer A should also consider contacting local government officials to advocate for the implementation of appropriate and updated region-wide building codes in all jurisdictions for the geographical area where or near where the residential development project is being built.", "If Client A refuses to agree with Engineer A's design standard, Engineer A should withdraw from the project." ; proeth:wasattributedto "Case 87 Extraction" ; prov:generatedAtTime "2026-02-27T16:34:23.747157"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 87 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
87
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-27T15:43:01.811893+00:00
First case
87
Generated
2026-02-27T15:43:01.811893+00:00
Attributed to
Case 87 Extraction
Generated
2026-02-27T16:34:23.747157
Generated by
ProEthica Case 87 Extraction