Engineer A Coastal Risk Assessment Persistent Client Persuasion Before Withdrawal
O · Obligation
Individual
http://proethica.org/ontology/case/87#Engineer_A_Coastal_Risk_Assessment_Persistent_Client_Persuasion_Before_Withdrawal
Properties
Instance of
PersistentClientSafetyPersuasionBeforeWithdrawalObligation
http://proethica.org/ontology/intermediate#PersistentClientSafetyPersuasionBeforeWithdrawalObligation
Case context
Client A refused to accept Engineer A's professionally determined 100-year storm surge elevation standard on cost grounds; Engineer A must pursue persuasion before withdrawal
Compliance status
unclear
Confidence
0.88
Importance
high
Obligated party
Engineer A (coastal risk assessment)
Obligation statement
Engineer A was obligated to continue pursuing substantive discussions with Client A to convince Client A of the danger to future residents and the general public from building below the 100-year storm surge elevation, and of the potential for significant property and environmental damage, before withdrawing from the project.
Temporal scope
Upon Client A's refusal to accept the 100-year storm surge standard and before withdrawal from the project
Relationships
defeasibleUnder
Client A Cost-Based Refusal of 100-Year Storm Surge Standard, Confirmed Risk Without Adequate Safeguards — Storm Surge Elevation
derivedFromPrinciple
Faithful Agent Notification Obligation Invoked by Engineer A Coastal Case
Source Evidence
Source text
Engineer A should continue to pursue discussions with Client A to convince Client A of the danger in which future residents, as well as the general public, could be placed, and the potential for significant property and environmental damage.
Text references
Engineer A should continue to pursue discussions with Client A to convince Client A of the danger in which future residents, as well as the general public, could be placed, and the potential for significant property and environmental damage.
If Client A refuses to agree with Engineer A's design standard, Engineer A should withdraw from the project.
TTL
@prefix case87: <http://proethica.org/ontology/case/87#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case87:Engineer_A_Coastal_Risk_Assessment_Persistent_Client_Persuasion_Before_Withdrawal a proeth:PersistentClientSafetyPersuasionBeforeWithdrawalObligation,
owl:NamedIndividual ;
rdfs:label "Engineer A Coastal Risk Assessment Persistent Client Persuasion Before Withdrawal" ;
proeth-core:competesWith case87:Engineer_A_Coastal_Risk_Assessment_Client_Cost-Refusal_Non-Acquiescence ;
proeth-core:defeasibleUnder case87:Client_A_Cost-Based_Refusal_of_100-Year_Storm_Surge_Standard,
<http://proethica.org/ontology/case/87#Confirmed_Risk_Without_Adequate_Safeguards_—_Storm_Surge_Elevation> ;
proeth:casecontext "Client A refused to accept Engineer A's professionally determined 100-year storm surge elevation standard on cost grounds; Engineer A must pursue persuasion before withdrawal" ;
proeth:compliancestatus "unclear" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.88" ;
proeth:derivedFromPrinciple case87:Faithful_Agent_Notification_Obligation_Invoked_by_Engineer_A_Coastal_Case ;
proeth:discoveredincase "87" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-27T15:43:01.811893+00:00" ;
proeth:firstdiscoveredincase "87" ;
proeth:generatedattime "2026-02-27T15:43:01.811893+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer A (coastal risk assessment)" ;
proeth:obligationclass "Persistent Client Safety Persuasion Before Withdrawal Obligation" ;
proeth:obligationstatement "Engineer A was obligated to continue pursuing substantive discussions with Client A to convince Client A of the danger to future residents and the general public from building below the 100-year storm surge elevation, and of the potential for significant property and environmental damage, before withdrawing from the project." ;
proeth:sourcetext "Engineer A should continue to pursue discussions with Client A to convince Client A of the danger in which future residents, as well as the general public, could be placed, and the potential for significant property and environmental damage." ;
proeth:temporalscope "Upon Client A's refusal to accept the 100-year storm surge standard and before withdrawal from the project" ;
proeth:textreferences "Engineer A should continue to pursue discussions with Client A to convince Client A of the danger in which future residents, as well as the general public, could be placed, and the potential for significant property and environmental damage.",
"If Client A refuses to agree with Engineer A's design standard, Engineer A should withdraw from the project." ;
proeth:wasattributedto "Case 87 Extraction" ;
prov:generatedAtTime "2026-02-27T16:34:23.745786"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 87 Extraction" .
Metadata
Extraction details
Discovered in case
87
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-27T15:43:01.811893+00:00
First case
87
Generated
2026-02-27T15:43:01.811893+00:00
Attributed to
Case 87 Extraction
Generated
2026-02-27T16:34:23.745786
Generated by
ProEthica Case 87 Extraction