Engineer A Client Budget Constraint Disclosure Storm Surge Obligation
O · Obligation
Individual
http://proethica.org/ontology/case/87#Engineer_A_Client_Budget_Constraint_Disclosure_Storm_Surge_Obligation
Properties
Instance of
ClientBudgetConstraintDisclosureObligation
http://proethica.org/ontology/intermediate#ClientBudgetConstraintDisclosureObligation
Case context
Client A refused to build to the 100-year storm surge elevation because of the increased cost, requiring Engineer A to communicate that this budget constraint creates material public safety risks.
Compliance status
unclear
Confidence
0.88
Importance
high
Obligated party
Engineer A
Obligation statement
Engineer A is obligated to clearly communicate to Client A that Client A's refusal to fund construction to the 100-year storm surge elevation creates and materially increases risks to public safety, health, and welfare — specifically the risk to future residents from storm surge events — and to document that communication.
Temporal scope
Upon Client A's refusal to accept the 100-year storm surge recommendation on cost grounds
Relationships
defeasibleUnder
Client A Cost-Based Refusal of 100-Year Storm Surge Standard
Source Evidence
Source text
Because of the increased cost, Owner refuses to agree that the residential development project be built to a 100-year projection storm surge elevation.
Text references
Because of the increased cost, Owner refuses to agree that the residential development project be built to a 100-year projection storm surge elevation.
Engineer A believes the residential development project should be built to a 100-year projected storm surge elevation, due to public safety risks even at lower projections of future surge level rise.
TTL
@prefix case87: <http://proethica.org/ontology/case/87#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case87:Engineer_A_Client_Budget_Constraint_Disclosure_Storm_Surge_Obligation a proeth:ClientBudgetConstraintDisclosureObligation,
owl:NamedIndividual ;
rdfs:label "Engineer A Client Budget Constraint Disclosure Storm Surge Obligation" ;
proeth-core:defeasibleUnder case87:Client_A_Cost-Based_Refusal_of_100-Year_Storm_Surge_Standard ;
proeth:casecontext "Client A refused to build to the 100-year storm surge elevation because of the increased cost, requiring Engineer A to communicate that this budget constraint creates material public safety risks." ;
proeth:compliancestatus "unclear" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.88" ;
proeth:derivedFromPrinciple case87:Client_Loyalty_Obligation_of_Engineer_A_Bounded_by_Public_Safety,
case87:Proactive_Risk_Disclosure_Invoked_By_Engineer_A ;
proeth:discoveredincase "87" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-27T15:37:08.527715+00:00" ;
proeth:firstdiscoveredincase "87" ;
proeth:generatedattime "2026-02-27T15:37:08.527715+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer A" ;
proeth:obligationclass "Client Budget Constraint Disclosure Obligation" ;
proeth:obligationstatement "Engineer A is obligated to clearly communicate to Client A that Client A's refusal to fund construction to the 100-year storm surge elevation creates and materially increases risks to public safety, health, and welfare — specifically the risk to future residents from storm surge events — and to document that communication." ;
proeth:sourcetext "Because of the increased cost, Owner refuses to agree that the residential development project be built to a 100-year projection storm surge elevation." ;
proeth:temporalscope "Upon Client A's refusal to accept the 100-year storm surge recommendation on cost grounds" ;
proeth:textreferences "Because of the increased cost, Owner refuses to agree that the residential development project be built to a 100-year projection storm surge elevation.",
"Engineer A believes the residential development project should be built to a 100-year projected storm surge elevation, due to public safety risks even at lower projections of future surge level rise." ;
proeth:wasattributedto "Case 87 Extraction" ;
prov:generatedAtTime "2026-02-27T16:34:23.737809"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 87 Extraction" .
Metadata
Extraction details
Discovered in case
87
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-27T15:37:08.527715+00:00
First case
87
Generated
2026-02-27T15:37:08.527715+00:00
Attributed to
Case 87 Extraction
Generated
2026-02-27T16:34:23.737809
Generated by
ProEthica Case 87 Extraction