Client A refused to build to the 100-year storm surge elevation because of the increased cost, requiring Engineer A to communicate that this budget constraint creates material public safety risks.
Compliance status
unclear
Confidence
0.88
Importance
high
Obligated party
Engineer A
Obligation statement
Engineer A is obligated to clearly communicate to Client A that Client A's refusal to fund construction to the 100-year storm surge elevation creates and materially increases risks to public safety, health, and welfare — specifically the risk to future residents from storm surge events — and to document that communication.
Temporal scope
Upon Client A's refusal to accept the 100-year storm surge recommendation on cost grounds
Source Evidence
Source text
Because of the increased cost, Owner refuses to agree that the residential development project be built to a 100-year projection storm surge elevation.

Text references
Because of the increased cost, Owner refuses to agree that the residential development project be built to a 100-year projection storm surge elevation.
Engineer A believes the residential development project should be built to a 100-year projected storm surge elevation, due to public safety risks even at lower projections of future surge level rise.
TTL
@prefix case87: <http://proethica.org/ontology/case/87#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case87:Engineer_A_Client_Budget_Constraint_Disclosure_Storm_Surge_Obligation a proeth:ClientBudgetConstraintDisclosureObligation, owl:NamedIndividual ; rdfs:label "Engineer A Client Budget Constraint Disclosure Storm Surge Obligation" ; proeth-core:defeasibleUnder case87:Client_A_Cost-Based_Refusal_of_100-Year_Storm_Surge_Standard ; proeth:casecontext "Client A refused to build to the 100-year storm surge elevation because of the increased cost, requiring Engineer A to communicate that this budget constraint creates material public safety risks." ; proeth:compliancestatus "unclear" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.88" ; proeth:derivedFromPrinciple case87:Client_Loyalty_Obligation_of_Engineer_A_Bounded_by_Public_Safety, case87:Proactive_Risk_Disclosure_Invoked_By_Engineer_A ; proeth:discoveredincase "87" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-27T15:37:08.527715+00:00" ; proeth:firstdiscoveredincase "87" ; proeth:generatedattime "2026-02-27T15:37:08.527715+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Engineer A" ; proeth:obligationclass "Client Budget Constraint Disclosure Obligation" ; proeth:obligationstatement "Engineer A is obligated to clearly communicate to Client A that Client A's refusal to fund construction to the 100-year storm surge elevation creates and materially increases risks to public safety, health, and welfare — specifically the risk to future residents from storm surge events — and to document that communication." ; proeth:sourcetext "Because of the increased cost, Owner refuses to agree that the residential development project be built to a 100-year projection storm surge elevation." ; proeth:temporalscope "Upon Client A's refusal to accept the 100-year storm surge recommendation on cost grounds" ; proeth:textreferences "Because of the increased cost, Owner refuses to agree that the residential development project be built to a 100-year projection storm surge elevation.", "Engineer A believes the residential development project should be built to a 100-year projected storm surge elevation, due to public safety risks even at lower projections of future surge level rise." ; proeth:wasattributedto "Case 87 Extraction" ; prov:generatedAtTime "2026-02-27T16:34:23.737809"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 87 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
87
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-27T15:37:08.527715+00:00
First case
87
Generated
2026-02-27T15:37:08.527715+00:00
Attributed to
Case 87 Extraction
Generated
2026-02-27T16:34:23.737809
Generated by
ProEthica Case 87 Extraction