Engineer A 100-Year Storm Surge Recommendation Obligation

O · Obligation Individual
http://proethica.org/ontology/case/87#Engineer_A_100-Year_Storm_Surge_Recommendation_Obligation
Properties
Instance of
100-YearStormSurgeDesignStandardRecommendationObligation
http://proethica.org/ontology/intermediate#100-YearStormSurgeDesignStandardRecommendationObligation
Case context
Engineer A performed hydrodynamic modeling and coastal risk assessment for a coastal residential development project in a no-code jurisdiction and determined that the 100-year storm surge elevation is required for public safety.
Compliance status
met
Confidence
0.91
Importance
high
Obligated party
Engineer A
Obligation statement
Engineer A is obligated to formally recommend in writing that Client A's residential development project be built to the 100-year projected storm surge elevation, including the scientific and professional basis for that recommendation derived from newly released climate data and the recently developed modeling algorithm.
Temporal scope
Upon completion of the hydrodynamic modeling and coastal risk assessment, before any design proceeds
Source Evidence
Source text
Based on newly released information as well as a recently developed algorithm that includes newly identified historic weather data, Engineer A believes the residential development project should be built to a 100-year projected storm surge elevation, due to public safety risks even at lower projections of future surge level rise.

Text references
Based on newly released information as well as a recently developed algorithm that includes newly identified historic weather data, Engineer A believes the residential development project should be built to a 100-year projected storm surge elevation, due to public safety risks even at lower projections of future surge level rise.
TTL
@prefix case87: <http://proethica.org/ontology/case/87#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case87:Engineer_A_100-Year_Storm_Surge_Recommendation_Obligation a proeth:100-YearStormSurgeDesignStandardRecommendationObligation, owl:NamedIndividual ; rdfs:label "Engineer A 100-Year Storm Surge Recommendation Obligation" ; proeth-core:competesWith case87:Engineer_A_Faithful_Agent_Written_Risk_Notification_Storm_Surge_Obligation ; proeth-core:prevailsOver case87:Engineer_A_Faithful_Agent_Written_Risk_Notification_Storm_Surge_Obligation ; proeth:casecontext "Engineer A performed hydrodynamic modeling and coastal risk assessment for a coastal residential development project in a no-code jurisdiction and determined that the 100-year storm surge elevation is required for public safety." ; proeth:compliancestatus "met" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.91" ; proeth:derivedFromPrinciple case87:Climate-Informed_Infrastructure_Design_Standard_Invoked_by_Engineer_A, case87:Public_Welfare_Paramount_Invoked_by_Engineer_A_Coastal_Risk_Assessment ; proeth:discoveredincase "87" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-27T15:37:08.527715+00:00" ; proeth:firstdiscoveredincase "87" ; proeth:generatedattime "2026-02-27T15:37:08.527715+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Engineer A" ; proeth:obligationclass "100-Year Storm Surge Design Standard Recommendation Obligation" ; proeth:obligationstatement "Engineer A is obligated to formally recommend in writing that Client A's residential development project be built to the 100-year projected storm surge elevation, including the scientific and professional basis for that recommendation derived from newly released climate data and the recently developed modeling algorithm." ; proeth:sourcetext "Based on newly released information as well as a recently developed algorithm that includes newly identified historic weather data, Engineer A believes the residential development project should be built to a 100-year projected storm surge elevation, due to public safety risks even at lower projections of future surge level rise." ; proeth:temporalscope "Upon completion of the hydrodynamic modeling and coastal risk assessment, before any design proceeds" ; proeth:textreferences "Based on newly released information as well as a recently developed algorithm that includes newly identified historic weather data, Engineer A believes the residential development project should be built to a 100-year projected storm surge elevation, due to public safety risks even at lower projections of future surge level rise." ; proeth:wasattributedto "Case 87 Extraction" ; prov:generatedAtTime "2026-02-27T16:34:23.735461"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 87 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
87
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-27T15:37:08.527715+00:00
First case
87
Generated
2026-02-27T15:37:08.527715+00:00
Attributed to
Case 87 Extraction
Generated
2026-02-27T16:34:23.735461
Generated by
ProEthica Case 87 Extraction