DP1
Individual
http://proethica.org/ontology/case/85#DP1
Properties
Instance of
Decision Point Id
DP1
Decision question
Should Engineer A disclose the incompleteness of the dam design documents to the client and approving authority at the time of submission, or submit the documents without flagging the deficiency?
Focus
Engineer A submitted incomplete dam design drawings and specifications under time pressure, without disclosing the deficiency to the client or approving authority at the time of submission.
Option1
Formally notify the client and approving authority in writing that the submitted documents are incomplete, identify the missing elements, and specify conditions under which completion would occur.
Option2
Submit the documents on schedule on the assumption that all parties understand the staged nature of the design due to the pending federal funding, without a formal written disclosure of incompleteness.
Option3
Refuse to submit the documents until they meet minimum completeness standards, even if this means missing the deadline and potentially jeopardizing the funding timeline.
Role
Engineer
TTL
@prefix case85: <http://proethica.org/ontology/case/85#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-cases: <http://proethica.org/ontology/cases#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
case85:DP1 a proeth-cases:DecisionPoint,
owl:NamedIndividual ;
rdfs:label "DP1" ;
proeth:decisionPointId "DP1" ;
proeth:decisionQuestion "Should Engineer A disclose the incompleteness of the dam design documents to the client and approving authority at the time of submission, or submit the documents without flagging the deficiency?" ;
proeth:focus "Engineer A submitted incomplete dam design drawings and specifications under time pressure, without disclosing the deficiency to the client or approving authority at the time of submission." ;
proeth:option1 "Formally notify the client and approving authority in writing that the submitted documents are incomplete, identify the missing elements, and specify conditions under which completion would occur." ;
proeth:option2 "Submit the documents on schedule on the assumption that all parties understand the staged nature of the design due to the pending federal funding, without a formal written disclosure of incompleteness." ;
proeth:option3 "Refuse to submit the documents until they meet minimum completeness standards, even if this means missing the deadline and potentially jeopardizing the funding timeline." ;
proeth:roleLabel "Engineer" ;
prov:wasAttributedTo "claude-sonnet-4-6" ;
prov:wasGeneratedBy "ProEthica Case 85 Extraction" .
Metadata
Extraction details
Attributed to
claude-sonnet-4-6
Generated by
ProEthica Case 85 Extraction