Public Agency Bridge Overhaul Client

R · Role Individual
http://proethica.org/ontology/case/83#Public_Agency_Bridge_Overhaul_Client
Definition

Retained VWX Architects and Engineers for a major scheduled bridge overhaul; received verbal notification of the out-of-scope wall defect observation through the VWX intermediary; bore responsibility for taking corrective action within a reasonable period as a condition of Engineer A's ethical compliance with non-reporting.

Properties
Instance of
ParticipantRole
http://proethica.org/ontology/intermediate#ParticipantRole
Attributes
entity_typePublic Agency
authorityInfrastructure owner and client with corrective action responsibility
Confidence
0.82
Importance
medium
Relationships
typeclient_of
targetVWX Architects and Engineers Prime Consultant
typecorrective_action_responsible
targetBridge wall defect
Role category
provider_client
Source Evidence
Source text
a public agency retained the services of VWX Architects and Engineers to perform a major scheduled overhaul of a bridge.

Text references
Engineer A had an obligation to follow through to see that correct follow-up action was taken by the public agency.
The public agency contacted VWX Architects and Engineers
a public agency retained the services of VWX Architects and Engineers to perform a major scheduled overhaul of a bridge.
TTL
@prefix case83: <http://proethica.org/ontology/case/83#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case83:Public_Agency_Bridge_Overhaul_Client a proeth:ParticipantRole, owl:NamedIndividual ; rdfs:label "Public Agency Bridge Overhaul Client" ; proeth:attributes "{'entity_type': 'Public Agency', 'authority': 'Infrastructure owner and client with corrective action responsibility'}" ; proeth:caseinvolvement "Retained VWX Architects and Engineers for a major scheduled bridge overhaul; received verbal notification of the out-of-scope wall defect observation through the VWX intermediary; bore responsibility for taking corrective action within a reasonable period as a condition of Engineer A's ethical compliance with non-reporting." ; proeth:conceptCategory "Role" ; proeth:confidence "0.82" ; proeth:discoveredincase "83" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-27T18:56:14.250352+00:00" ; proeth:firstdiscoveredincase "83" ; proeth:generatedattime "2026-02-27T18:56:14.250352+00:00" ; proeth:importance "medium" ; proeth:relationships "{'type': 'client_of', 'target': 'VWX Architects and Engineers Prime Consultant'}", "{'type': 'corrective_action_responsible', 'target': 'Bridge wall defect'}" ; proeth:rolecategory "provider_client" ; proeth:roleclass "Participant Role" ; proeth:sourcetext "a public agency retained the services of VWX Architects and Engineers to perform a major scheduled overhaul of a bridge." ; proeth:textreferences "Engineer A had an obligation to follow through to see that correct follow-up action was taken by the public agency.", "The public agency contacted VWX Architects and Engineers", "a public agency retained the services of VWX Architects and Engineers to perform a major scheduled overhaul of a bridge." ; proeth:wasattributedto "Case 83 Extraction" ; prov:generatedAtTime "2026-02-27T19:15:08.296003"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 83 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
83
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-27T18:56:14.250352+00:00
First case
83
Generated
2026-02-27T18:56:14.250352+00:00
Attributed to
Case 83 Extraction
Generated
2026-02-27T19:15:08.296003
Generated by
ProEthica Case 83 Extraction