DP1
Individual
http://proethica.org/ontology/case/8#DP1
Properties
Instance of
Decision Point Id
DP1
Decision question
Should Engineer L have disclosed the preliminary stormwater risk concern to Client X at the time of work suspension, even though the risk had not yet been quantified or confirmed?
Focus
Engineer L identified a preliminary concern about increased stormwater risk to the community drinking water source during the design phase, but did not disclose this concern to Client X at the time work was suspended. The core question is whether Engineer L was obligated to disclose an unquantified, preliminary risk at the moment of suspension, or whether silence was permissible until the risk could be confirmed through further study.
Option1
Inform Client X at the time of work suspension that a preliminary concern about increased stormwater risk to the drinking water source has been identified, making clear that the concern is unquantified and that further study is needed before its magnitude can be assessed.
Option2
Withhold communication of the stormwater concern until additional studies are completed and the risk can be characterized with sufficient confidence to constitute a reportable finding, avoiding premature alarm based on unverified preliminary observations.
Option3
Document the preliminary concern in internal project records and propose to Client X that the scope of resumed work include a formal risk assessment, without characterizing the concern as a disclosed risk finding until the assessment is complete.
Role
Engineer L Stormwater Design Engineer
TTL
@prefix case8: <http://proethica.org/ontology/case/8#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-cases: <http://proethica.org/ontology/cases#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
case8:DP1 a proeth-cases:DecisionPoint,
owl:NamedIndividual ;
rdfs:label "DP1" ;
proeth:decisionPointId "DP1" ;
proeth:decisionQuestion "Should Engineer L have disclosed the preliminary stormwater risk concern to Client X at the time of work suspension, even though the risk had not yet been quantified or confirmed?" ;
proeth:focus "Engineer L identified a preliminary concern about increased stormwater risk to the community drinking water source during the design phase, but did not disclose this concern to Client X at the time work was suspended. The core question is whether Engineer L was obligated to disclose an unquantified, preliminary risk at the moment of suspension, or whether silence was permissible until the risk could be confirmed through further study." ;
proeth:option1 "Inform Client X at the time of work suspension that a preliminary concern about increased stormwater risk to the drinking water source has been identified, making clear that the concern is unquantified and that further study is needed before its magnitude can be assessed." ;
proeth:option2 "Withhold communication of the stormwater concern until additional studies are completed and the risk can be characterized with sufficient confidence to constitute a reportable finding, avoiding premature alarm based on unverified preliminary observations." ;
proeth:option3 "Document the preliminary concern in internal project records and propose to Client X that the scope of resumed work include a formal risk assessment, without characterizing the concern as a disclosed risk finding until the assessment is complete." ;
proeth:roleLabel "Engineer L Stormwater Design Engineer" ;
prov:wasAttributedTo "claude-sonnet-4-6" ;
prov:wasGeneratedBy "ProEthica Case 8 Extraction" .