Client Risk Notification
A · Action
Individual
http://proethica.org/ontology/case/8#Client_Risk_Notification
Definition
After completing additional studies, Engineer L formally notified Client X of the qualitatively identified risk that heavy rainfall could cause stormwater runoff to reach the watershed and community drinking water source, and advised that additional protective measures should be considered, citing local environmental standards requiring safeguards for public water sources.
Properties
Instance of
Event Role Context
licensed professional engineer, stormwater design consultant
Foreseen Unintended Effects
Client may resist additional investment, creating further ethical conflict
Fulfills Obligation Text
Advise Client of Project Unsuccessfulness Obligation
Faithful Agent or Trustee Obligation
Objective and Truthful Reporting Obligation
Paramount Duty to Public Health Safety and Welfare
Guided By Principle Text
Code Section II.3.a
Code Section III.1.b
Code Section III.3.a
Fundamental Canon I.1
Fundamental Canon I.4
Has Agent
Engineer L
Has Mental State
deliberate
Initiates Text
Client Informed of Runoff Risk State
Protective Measures Recommendation Pending State
Intended Outcome
Ensure Client X is fully informed of the concrete runoff risk and the need for protective measures, fulfilling both the duty to the client and the paramount duty to public health
Requires Capability Text
Environmental standards knowledge
Professional reporting
Risk communication
Temporal Extent
instant
Temporal Marker
After completion of additional studies, during the resumed project phase
Temporal Sequence
9
Terminates Text
Runoff Risk Undisclosed to Client State
Within Competence
true
Synthesis Literal
description
eventRoleContext
foreseenUnintendedEffects
hasAgent
hasMentalState
intendedOutcome
temporalExtent
temporalMarker
temporalSequence
withinCompetence
Relationships
fulfillsObligation
Engineer L Faithful Agent Boundary, Engineer L Preliminary Risk Silence, Engineer L Project Success Notification, Engineer L Risk Quantification Resumption
initiates
Engineer L Confirmed Runoff Risk
terminates
Engineer L Confirmed Runoff Risk, Engineer L Preliminary Risk Non-Disclosure, Engineer L Unconfirmed Risk Concern, Engineer L Undisclosed Risk at Suspension
hasTime
time Client Risk Notification
TTL
@prefix case8: <http://proethica.org/ontology/case/8#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix proeth-prov: <http://proethica.org/provenance#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix time: <http://www.w3.org/2006/time#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case8:Client_Risk_Notification a proeth-core:Action,
owl:NamedIndividual ;
rdfs:label "Client Risk Notification" ;
proeth-core:fulfillsObligation case8:Engineer_L_Faithful_Agent_Boundary,
case8:Engineer_L_Preliminary_Risk_Silence,
case8:Engineer_L_Project_Success_Notification,
case8:Engineer_L_Risk_Quantification_Resumption ;
proeth-core:initiates case8:Engineer_L_Confirmed_Runoff_Risk ;
proeth-core:terminates case8:Engineer_L_Confirmed_Runoff_Risk,
case8:Engineer_L_Preliminary_Risk_Non-Disclosure,
case8:Engineer_L_Unconfirmed_Risk_Concern,
case8:Engineer_L_Undisclosed_Risk_at_Suspension ;
proeth:conceptCategory "Action" ;
proeth:eventRoleContext "licensed professional engineer, stormwater design consultant" ;
proeth:foreseenUnintendedEffects "Client may resist additional investment, creating further ethical conflict" ;
proeth:fulfillsObligationText "Advise Client of Project Unsuccessfulness Obligation",
"Faithful Agent or Trustee Obligation",
"Objective and Truthful Reporting Obligation",
"Paramount Duty to Public Health Safety and Welfare" ;
proeth:guidedByPrincipleText "Code Section II.3.a",
"Code Section III.1.b",
"Code Section III.3.a",
"Fundamental Canon I.1",
"Fundamental Canon I.4" ;
proeth:hasAgent "Engineer L" ;
proeth:hasMentalState "deliberate" ;
proeth:initiatesText "Client Informed of Runoff Risk State",
"Protective Measures Recommendation Pending State" ;
proeth:intendedOutcome "Ensure Client X is fully informed of the concrete runoff risk and the need for protective measures, fulfilling both the duty to the client and the paramount duty to public health" ;
proeth:requiresCapabilityText "Environmental standards knowledge",
"Professional reporting",
"Risk communication" ;
proeth:temporalExtent "instant" ;
proeth:temporalMarker "After completion of additional studies, during the resumed project phase" ;
proeth:temporalSequence 9 ;
proeth:terminatesText "Runoff Risk Undisclosed to Client State" ;
proeth:withinCompetence true ;
proeth-prov:synthesisLiteral "description",
"eventRoleContext",
"foreseenUnintendedEffects",
"hasAgent",
"hasMentalState",
"intendedOutcome",
"temporalExtent",
"temporalMarker",
"temporalSequence",
"withinCompetence" ;
rdfs:comment "After completing additional studies, Engineer L formally notified Client X of the qualitatively identified risk that heavy rainfall could cause stormwater runoff to reach the watershed and community drinking water source, and advised that additional protective measures should be considered, citing local environmental standards requiring safeguards for public water sources." ;
time:hasTime case8:time_Client_Risk_Notification ;
prov:wasAttributedTo "claude-sonnet-4-6" ;
prov:wasGeneratedBy "ProEthica Case 8 Extraction" .
Metadata
Extraction details
Attributed to
claude-sonnet-4-6
Generated by
ProEthica Case 8 Extraction