Engineer-Stamped-Document-Responsibility-Standard

Rs · Resource Individual
http://proethica.org/ontology/case/79#Engineer-Stamped-Document-Responsibility-Standard
Properties
Instance of
EngineerStampedDocumentResponsibilityStandard
http://proethica.org/ontology/intermediate#EngineerStampedDocumentResponsibilityStandard
Confidence
0.86
Created by
Professional engineering ethics bodies
Document title
Engineer Stamped Document Responsibility Standard
Importance
high
Used by
Engineer A in fulfilling the sign-off obligation on final inspection reports
Used in context
Directly implicated by Engineer A's obligation to sign off on all final inspection reports, raising the question of whether Engineer A can ethically sign reports for inspections that he believes are inadequate due to the 60-per-day workload.
Version
Current
Source Evidence
Source text
Engineer A is required to sign off on all final inspection reports

Text references
Engineer A is required to sign off on all final inspection reports
TTL
@prefix case79: <http://proethica.org/ontology/case/79#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case79:Engineer-Stamped-Document-Responsibility-Standard a proeth:EngineerStampedDocumentResponsibilityStandard, owl:NamedIndividual ; rdfs:label "Engineer-Stamped-Document-Responsibility-Standard" ; proeth:conceptCategory "Resource" ; proeth:confidence "0.86" ; proeth:createdby "Professional engineering ethics bodies" ; proeth:discoveredincase "79" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:documenttitle "Engineer Stamped Document Responsibility Standard" ; proeth:firstdiscoveredat "2026-03-01T06:51:14.716356+00:00" ; proeth:firstdiscoveredincase "79" ; proeth:generatedattime "2026-03-01T06:51:14.716356+00:00" ; proeth:importance "high" ; proeth:resourceclass "Engineer Stamped Document Responsibility Standard" ; proeth:sourcetext "Engineer A is required to sign off on all final inspection reports" ; proeth:textreferences "Engineer A is required to sign off on all final inspection reports" ; proeth:usedby "Engineer A in fulfilling the sign-off obligation on final inspection reports" ; proeth:usedincontext "Directly implicated by Engineer A's obligation to sign off on all final inspection reports, raising the question of whether Engineer A can ethically sign reports for inspections that he believes are inadequate due to the 60-per-day workload." ; proeth:version "Current" ; proeth:wasattributedto "Case 79 Extraction" ; prov:generatedAtTime "2026-03-01T07:16:01.166919"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 79 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
79
Discovered in pass
1
Discovered in section
facts
First discovered
2026-03-01T06:51:14.716356+00:00
First case
79
Generated
2026-03-01T06:51:14.716356+00:00
Attributed to
Case 79 Extraction
Generated
2026-03-01T07:16:01.166919
Generated by
ProEthica Case 79 Extraction