Contractor Reuse Decision Creating Unresolved Structural Risk

S · State Individual
http://proethica.org/ontology/case/78#Contractor_Reuse_Decision_Creating_Unresolved_Structural_Risk
Properties
Instance of
ConfirmedRiskWithoutAdequateSafeguardsState
http://proethica.org/ontology/intermediate#ConfirmedRiskWithoutAdequateSafeguardsState
Active period
From Engineer A's confirmation of serious under-design through the end of the case facts; contractor's reuse decision is not reversed within the case
Affected parties
Construction contractor
Engineer A
Future occupants of the residence
Insurance company
Confidence
0.82
Importance
high
Subject
Construction contractor's determination that the seriously under-designed beam could be reused, despite Engineer A's subsequent finding of serious under-design
Terminated by
Not terminated within the case facts
Triggering event
Engineer A's structural calculations confirm serious under-design of a beam the contractor has already decided to reuse on the project
Urgency level
high
Source Evidence
Source text
Engineer A learns that the construction contractor determined that the beam could be reused on the project

Text references
Engineer A determines that the beam was seriously under-designed
Engineer A learns that the construction contractor determined that the beam could be reused on the project
TTL
@prefix case78: <http://proethica.org/ontology/case/78#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case78:Contractor_Reuse_Decision_Creating_Unresolved_Structural_Risk a proeth:ConfirmedRiskWithoutAdequateSafeguardsState, owl:NamedIndividual ; rdfs:label "Contractor Reuse Decision Creating Unresolved Structural Risk" ; proeth:activeperiod "From Engineer A's confirmation of serious under-design through the end of the case facts; contractor's reuse decision is not reversed within the case" ; proeth:affectedparties "Construction contractor", "Engineer A", "Future occupants of the residence", "Insurance company" ; proeth:conceptCategory "State" ; proeth:confidence "0.82" ; proeth:discoveredincase "78" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-27T04:51:35.554670+00:00" ; proeth:firstdiscoveredincase "78" ; proeth:generatedattime "2026-02-27T04:51:35.554670+00:00" ; proeth:importance "high" ; proeth:sourcetext "Engineer A learns that the construction contractor determined that the beam could be reused on the project" ; proeth:stateclass "Confirmed Risk Without Adequate Safeguards State" ; proeth:subject "Construction contractor's determination that the seriously under-designed beam could be reused, despite Engineer A's subsequent finding of serious under-design" ; proeth:terminatedby "Not terminated within the case facts" ; proeth:textreferences "Engineer A determines that the beam was seriously under-designed", "Engineer A learns that the construction contractor determined that the beam could be reused on the project" ; proeth:triggeringevent "Engineer A's structural calculations confirm serious under-design of a beam the contractor has already decided to reuse on the project" ; proeth:urgencylevel "high" ; proeth:wasattributedto "Case 78 Extraction" ; prov:generatedAtTime "2026-02-27T05:38:29.572311"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 78 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
78
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-27T04:51:35.554670+00:00
First case
78
Generated
2026-02-27T04:51:35.554670+00:00
Attributed to
Case 78 Extraction
Generated
2026-02-27T05:38:29.572311
Generated by
ProEthica Case 78 Extraction