Engineer Retention
E · Event
Individual
http://proethica.org/ontology/case/76#Engineer_Retention
Definition
Engineer B was retained by the MWC to evaluate the treatment requirements and infrastructure needs associated with a potential switch to the local river as a water source.
Properties
Instance of
Causes State Change
Engineer B entered a formal consulting relationship with the MWC, creating a professional engagement with associated duties.
Event Type
outcome
Initiates Text
Active Consulting Engagement
Professional Duty to Client
Severity
routine
Temporal Extent
instant
Temporal Marker
Before report submission
Temporal Sequence
2
Synthesis Literal
causesStateChange
description
eventType
severity
temporalExtent
temporalMarker
temporalSequence
Relationships
hasTime
time Engineer Retention
TTL
@prefix case76: <http://proethica.org/ontology/case/76#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix proeth-prov: <http://proethica.org/provenance#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix time: <http://www.w3.org/2006/time#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case76:Engineer_Retention a proeth-core:Event,
owl:NamedIndividual ;
rdfs:label "Engineer Retention" ;
proeth-core:initiates case76:Engineer_A_Client_Relationship_MWC,
case76:Engineer_B_Client_Relationship_MWC ;
proeth:causesStateChange "Engineer B entered a formal consulting relationship with the MWC, creating a professional engagement with associated duties." ;
proeth:conceptCategory "Event" ;
proeth:eventType "outcome" ;
proeth:initiatesText "Active Consulting Engagement",
"Professional Duty to Client" ;
proeth:severity "routine" ;
proeth:temporalExtent "instant" ;
proeth:temporalMarker "Before report submission" ;
proeth:temporalSequence 2 ;
proeth-prov:synthesisLiteral "causesStateChange",
"description",
"eventType",
"severity",
"temporalExtent",
"temporalMarker",
"temporalSequence" ;
rdfs:comment "Engineer B was retained by the MWC to evaluate the treatment requirements and infrastructure needs associated with a potential switch to the local river as a water source." ;
time:hasTime case76:time_Engineer_Retention ;
prov:wasAttributedTo "claude-sonnet-4-6" ;
prov:wasGeneratedBy "ProEthica Case 76 Extraction" .
Metadata
Extraction details
Attributed to
claude-sonnet-4-6
Generated by
ProEthica Case 76 Extraction