Engineer Retention

E · Event Individual
http://proethica.org/ontology/case/76#Engineer_Retention
Definition

Engineer B was retained by the MWC to evaluate the treatment requirements and infrastructure needs associated with a potential switch to the local river as a water source.

Properties
Instance of
Event
http://proethica.org/ontology/core#Event
Causes State Change
Engineer B entered a formal consulting relationship with the MWC, creating a professional engagement with associated duties.
Event Type
outcome
Initiates Text
Active Consulting Engagement
Professional Duty to Client
Severity
routine
Temporal Extent
instant
Temporal Marker
Before report submission
Temporal Sequence
2
Synthesis Literal
causesStateChange
description
eventType
severity
temporalExtent
temporalMarker
temporalSequence
TTL
@prefix case76: <http://proethica.org/ontology/case/76#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix proeth-prov: <http://proethica.org/provenance#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix time: <http://www.w3.org/2006/time#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case76:Engineer_Retention a proeth-core:Event, owl:NamedIndividual ; rdfs:label "Engineer Retention" ; proeth-core:initiates case76:Engineer_A_Client_Relationship_MWC, case76:Engineer_B_Client_Relationship_MWC ; proeth:causesStateChange "Engineer B entered a formal consulting relationship with the MWC, creating a professional engagement with associated duties." ; proeth:conceptCategory "Event" ; proeth:eventType "outcome" ; proeth:initiatesText "Active Consulting Engagement", "Professional Duty to Client" ; proeth:severity "routine" ; proeth:temporalExtent "instant" ; proeth:temporalMarker "Before report submission" ; proeth:temporalSequence 2 ; proeth-prov:synthesisLiteral "causesStateChange", "description", "eventType", "severity", "temporalExtent", "temporalMarker", "temporalSequence" ; rdfs:comment "Engineer B was retained by the MWC to evaluate the treatment requirements and infrastructure needs associated with a potential switch to the local river as a water source." ; time:hasTime case76:time_Engineer_Retention ; prov:wasAttributedTo "claude-sonnet-4-6" ; prov:wasGeneratedBy "ProEthica Case 76 Extraction" .
Metadata
Type
Individual
Last Updated
2026-06-05 11:56
Attributed to
claude-sonnet-4-6
Generated by
ProEthica Case 76 Extraction