Engineer A Stamped Document Author in Active Proceeding

S · State Individual
http://proethica.org/ontology/case/75#Engineer_A_Stamped_Document_Author_in_Active_Proceeding
Properties
Instance of
StampedDocumentAuthorinActiveAdversarialProceedingState
http://proethica.org/ontology/intermediate#StampedDocumentAuthorinActiveAdversarialProceedingState
Active period
From the stamping of the final document through all remaining stages of the court proceeding
Affected parties
Client
Co-stamping engineer at the firm
Court
Engineer A
Private engineering firm
The State
Confidence
0.92
Importance
high
Subject
Engineer A's professional responsibility for the co-stamped water-rights analysis document that is now the subject of an ongoing adversarial court proceeding
Terminated by
Final court judgment on the water-rights application
Triggering event
Engineer A co-stamping the final water-rights analysis document, combined with the document entering the adversarial court process and Engineer A transitioning to the opposing side
Urgency level
high
Source Evidence
Source text
Engineer A, along with one other employee at the firm, stamped the final document

Text references
Engineer A feels that he can and should support the work he performed and which was included in the stamped report
Engineer A, along with one other employee at the firm, stamped the final document
he is concerned about the remaining steps in the court process
TTL
@prefix case75: <http://proethica.org/ontology/case/75#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case75:Engineer_A_Stamped_Document_Author_in_Active_Proceeding a proeth:StampedDocumentAuthorinActiveAdversarialProceedingState, owl:NamedIndividual ; rdfs:label "Engineer A Stamped Document Author in Active Proceeding" ; proeth:activeperiod "From the stamping of the final document through all remaining stages of the court proceeding" ; proeth:affectedparties "Client", "Co-stamping engineer at the firm", "Court", "Engineer A", "Private engineering firm", "The State" ; proeth:conceptCategory "State" ; proeth:confidence "0.92" ; proeth:discoveredincase "75" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-27T00:10:15.151348+00:00" ; proeth:firstdiscoveredincase "75" ; proeth:generatedattime "2026-02-27T00:10:15.151348+00:00" ; proeth:importance "high" ; proeth:sourcetext "Engineer A, along with one other employee at the firm, stamped the final document" ; proeth:stateclass "Stamped Document Author in Active Adversarial Proceeding State" ; proeth:subject "Engineer A's professional responsibility for the co-stamped water-rights analysis document that is now the subject of an ongoing adversarial court proceeding" ; proeth:terminatedby "Final court judgment on the water-rights application" ; proeth:textreferences "Engineer A feels that he can and should support the work he performed and which was included in the stamped report", "Engineer A, along with one other employee at the firm, stamped the final document", "he is concerned about the remaining steps in the court process" ; proeth:triggeringevent "Engineer A co-stamping the final water-rights analysis document, combined with the document entering the adversarial court process and Engineer A transitioning to the opposing side" ; proeth:urgencylevel "high" ; proeth:wasattributedto "Case 75 Extraction" ; prov:generatedAtTime "2026-02-27T00:31:30.967277"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 75 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
75
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-27T00:10:15.151348+00:00
First case
75
Generated
2026-02-27T00:10:15.151348+00:00
Attributed to
Case 75 Extraction
Generated
2026-02-27T00:31:30.967277
Generated by
ProEthica Case 75 Extraction