Solar-Without-Storage Grid Stress Risk
S · State
Individual
http://proethica.org/ontology/case/73#Solar-Without-Storage_Grid_Stress_Risk
Properties
Instance of
Third-PartyGridStressRiskState
http://proethica.org/ontology/intermediate#Third-PartyGridStressRiskState
Active period
From the point Engineer A identifies the grid reliability implications through the board's final decision
Affected parties
Elderly and medically vulnerable third parties
Engineer A
General public
Local utility grid users
Organization/Board
Confidence
0.97
Importance
high
Subject
Proposed replacement of fossil-fueled generator with solar production without storage
Terminated by
Board decision incorporating full reliability and grid-impact information
Triggering event
Organization's decision to consider replacing on-demand fossil-fueled generator with solar production without battery storage, creating intermittent supply and increased grid demand stress during peak/extreme weather events
Urgency level
high
Source Evidence
Source text
this option may also increase the likelihood of future rolling blackouts
Text references
Installing a system without storage may result in rolling blackouts and facility interruptions
a system without energy storage decreases the reliability of the entire local electric power system
the stress placed upon elderly or confined individuals as well as those with medical conditions if they are left without a comfortable environment during an extreme weather event
this option may also increase the likelihood of future rolling blackouts
TTL
@prefix case73: <http://proethica.org/ontology/case/73#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case73:Solar-Without-Storage_Grid_Stress_Risk a proeth:Third-PartyGridStressRiskState,
owl:NamedIndividual ;
rdfs:label "Solar-Without-Storage Grid Stress Risk" ;
proeth:activeperiod "From the point Engineer A identifies the grid reliability implications through the board's final decision" ;
proeth:affectedparties "Elderly and medically vulnerable third parties",
"Engineer A",
"General public",
"Local utility grid users",
"Organization/Board" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.97" ;
proeth:discoveredincase "73" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-26T22:28:50.636637+00:00" ;
proeth:firstdiscoveredincase "73" ;
proeth:generatedattime "2026-02-26T22:28:50.636637+00:00" ;
proeth:importance "high" ;
proeth:sourcetext "this option may also increase the likelihood of future rolling blackouts" ;
proeth:stateclass "Third-Party Grid Stress Risk State" ;
proeth:subject "Proposed replacement of fossil-fueled generator with solar production without storage" ;
proeth:terminatedby "Board decision incorporating full reliability and grid-impact information" ;
proeth:textreferences "Installing a system without storage may result in rolling blackouts and facility interruptions",
"a system without energy storage decreases the reliability of the entire local electric power system",
"the stress placed upon elderly or confined individuals as well as those with medical conditions if they are left without a comfortable environment during an extreme weather event",
"this option may also increase the likelihood of future rolling blackouts" ;
proeth:triggeringevent "Organization's decision to consider replacing on-demand fossil-fueled generator with solar production without battery storage, creating intermittent supply and increased grid demand stress during peak/extreme weather events" ;
proeth:urgencylevel "high" ;
proeth:wasattributedto "Case 73 Extraction" ;
prov:generatedAtTime "2026-02-26T22:54:37.518144"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 73 Extraction" .
Metadata
Extraction details
Discovered in case
73
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-26T22:28:50.636637+00:00
First case
73
Generated
2026-02-26T22:28:50.636637+00:00
Attributed to
Case 73 Extraction
Generated
2026-02-26T22:54:37.518144
Generated by
ProEthica Case 73 Extraction