Professional Report Integrity Standard – Board Report Completeness
Rs · Resource
Individual
http://proethica.org/ontology/case/73#Professional_Report_Integrity_Standard_–_Board_Report_Completeness
Properties
Instance of
ProfessionalReportIntegrityStandard
http://proethica.org/ontology/intermediate#ProfessionalReportIntegrityStandard
Confidence
0.88
Created by
Professional engineering community / NSPE
Document title
Professional norms governing completeness and transparency of engineering reports to decision-making bodies
Importance
high
Used by
Engineer A in preparing the report for the board
Used in context
Governs Engineer A's obligation to present the board with a complete and non-misleading report that includes the rolling-blackout risk, not merely the isolated viability of the solar project
Version
Current
Source Evidence
Source text
Engineer A is preparing a report that will be presented to the board to consider the new solar project
Text references
Engineer A is preparing a report that will be presented to the board to consider the new solar project
is convinced that the solar project, when considered in isolation, is viable
TTL
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
<http://proethica.org/ontology/case/73#Professional_Report_Integrity_Standard_–_Board_Report_Completeness> a proeth:ProfessionalReportIntegrityStandard,
owl:NamedIndividual ;
rdfs:label "Professional Report Integrity Standard – Board Report Completeness" ;
proeth:conceptCategory "Resource" ;
proeth:confidence "0.88" ;
proeth:createdby "Professional engineering community / NSPE" ;
proeth:discoveredincase "73" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:documenttitle "Professional norms governing completeness and transparency of engineering reports to decision-making bodies" ;
proeth:firstdiscoveredat "2026-02-26T22:27:33.123798+00:00" ;
proeth:firstdiscoveredincase "73" ;
proeth:generatedattime "2026-02-26T22:27:33.123798+00:00" ;
proeth:importance "high" ;
proeth:resourceclass "Professional Report Integrity Standard" ;
proeth:sourcetext "Engineer A is preparing a report that will be presented to the board to consider the new solar project" ;
proeth:textreferences "Engineer A is preparing a report that will be presented to the board to consider the new solar project",
"is convinced that the solar project, when considered in isolation, is viable" ;
proeth:usedby "Engineer A in preparing the report for the board" ;
proeth:usedincontext "Governs Engineer A's obligation to present the board with a complete and non-misleading report that includes the rolling-blackout risk, not merely the isolated viability of the solar project" ;
proeth:version "Current" ;
proeth:wasattributedto "Case 73 Extraction" ;
prov:generatedAtTime "2026-02-26T22:54:37.512925"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 73 Extraction" .
Metadata
Extraction details
Discovered in case
73
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-26T22:27:33.123798+00:00
First case
73
Generated
2026-02-26T22:27:33.123798+00:00
Attributed to
Case 73 Extraction
Generated
2026-02-26T22:54:37.512925
Generated by
ProEthica Case 73 Extraction