Local Utility Resource Planner Electric Utility Grid Resource Planner

R · Role Individual
http://proethica.org/ontology/case/73#Local_Utility_Resource_Planner_Electric_Utility_Grid_Resource_Planner
Definition

A representative of the local electric utility whose resource planners have reviewed the current generation mix and assessed that during extreme weather events they may be forced to institute rolling outages. This assessment, communicated to Engineer A, creates the obligation for Engineer A to disclose grid-level impacts in the board report.

Properties
Instance of
ElectricUtilityGridResourcePlanner
http://proethica.org/ontology/intermediate#ElectricUtilityGridResourcePlanner
Attributes
organizationLocal electric utility
functionGeneration resource mix planning and grid reliability assessment
Confidence
0.95
Importance
medium
Relationships
typeaffected_by
targetSolar project decision
typeinforms
targetEngineer A Energy Systems Reporting Engineer
Role category
participant
Source Evidence
Source text
When discussing the analysis of the electric load profile with a representative of the local electric utility, Engineer A learns that the utility resource planners reviewed their current generation mix and believe that during extreme weather events, they may be forced to institute rolling outages

Text references
When discussing the analysis of the electric load profile with a representative of the local electric utility, Engineer A learns that the utility resource planners reviewed their current generation mix and believe that during extreme weather events, they may be forced to institute rolling outages
TTL
@prefix case73: <http://proethica.org/ontology/case/73#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case73:Local_Utility_Resource_Planner_Electric_Utility_Grid_Resource_Planner a proeth:ElectricUtilityGridResourcePlanner, owl:NamedIndividual ; rdfs:label "Local Utility Resource Planner Electric Utility Grid Resource Planner" ; proeth:attributes "{'organization': 'Local electric utility', 'function': 'Generation resource mix planning and grid reliability assessment'}" ; proeth:caseinvolvement "A representative of the local electric utility whose resource planners have reviewed the current generation mix and assessed that during extreme weather events they may be forced to institute rolling outages. This assessment, communicated to Engineer A, creates the obligation for Engineer A to disclose grid-level impacts in the board report." ; proeth:conceptCategory "Role" ; proeth:confidence "0.95" ; proeth:discoveredincase "73" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-26T22:27:25.884461+00:00" ; proeth:firstdiscoveredincase "73" ; proeth:generatedattime "2026-02-26T22:27:25.884461+00:00" ; proeth:importance "medium" ; proeth:relationships "{'type': 'affected_by', 'target': 'Solar project decision'}", "{'type': 'informs', 'target': 'Engineer A Energy Systems Reporting Engineer'}" ; proeth:rolecategory "participant" ; proeth:roleclass "Electric Utility Grid Resource Planner" ; proeth:sourcetext "When discussing the analysis of the electric load profile with a representative of the local electric utility, Engineer A learns that the utility resource planners reviewed their current generation mix and believe that during extreme weather events, they may be forced to institute rolling outages" ; proeth:textreferences "When discussing the analysis of the electric load profile with a representative of the local electric utility, Engineer A learns that the utility resource planners reviewed their current generation mix and believe that during extreme weather events, they may be forced to institute rolling outages" ; proeth:wasattributedto "Case 73 Extraction" ; prov:generatedAtTime "2026-02-26T22:54:37.511824"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 73 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
73
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-26T22:27:25.884461+00:00
First case
73
Generated
2026-02-26T22:27:25.884461+00:00
Attributed to
Case 73 Extraction
Generated
2026-02-26T22:54:37.511824
Generated by
ProEthica Case 73 Extraction