Faithful Agent Notification Obligation Invoked By Engineer A Grid Risk

P · Principle Individual
http://proethica.org/ontology/case/73#Faithful_Agent_Notification_Obligation_Invoked_By_Engineer_A_Grid_Risk
Properties
Instance of
FaithfulAgentNotificationObligationforProjectSuccessRisk
http://proethica.org/ontology/intermediate#FaithfulAgentNotificationObligationforProjectSuccessRisk
Applied to
Board report on solar panel replacement decision
Organizational Board Energy Decision Authority
Balancing with
Client Loyalty
Scope limitations of contracted work
Concrete expression
Engineer A's faithful agent obligation to the organization requires notification of the rolling blackout risk discovered during the load profile analysis, even though the contracted scope was the solar panel load profile analysis rather than regional grid reliability assessment.
Confidence
0.93
Importance
high
Interpretation
The faithful agent relationship encompasses the organization's overall project welfare; the rolling blackout risk threatens the viability and wisdom of the solar project decision, and therefore falls within Engineer A's notification obligation even though it arose outside the contracted scope.
Invoked by
Engineer A Energy Systems Reporting Engineer
Tension resolution
Faithful agent obligation extends beyond literal contracted scope to encompass risks that affect the client's overall project welfare; Engineer A must include the utility's rolling blackout assessment in the board report.
Source Evidence
Source text
Engineer A learns that the utility resource planners reviewed their current generation mix and believe that during extreme weather events, they may be forced to institute rolling outages to keep system generating facilities on-line.

Text references
Engineer A is preparing a report that will be presented to the board to consider the new solar project.
Engineer A learns that the utility resource planners reviewed their current generation mix and believe that during extreme weather events, they may be forced to institute rolling outages to keep system generating facilities on-line.
TTL
@prefix case73: <http://proethica.org/ontology/case/73#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case73:Faithful_Agent_Notification_Obligation_Invoked_By_Engineer_A_Grid_Risk a proeth:FaithfulAgentNotificationObligationforProjectSuccessRisk, owl:NamedIndividual ; rdfs:label "Faithful Agent Notification Obligation Invoked By Engineer A Grid Risk" ; proeth:appliedto "Board report on solar panel replacement decision", "Organizational Board Energy Decision Authority" ; proeth:balancingwith "Client Loyalty", "Scope limitations of contracted work" ; proeth:conceptCategory "Principle" ; proeth:concreteexpression "Engineer A's faithful agent obligation to the organization requires notification of the rolling blackout risk discovered during the load profile analysis, even though the contracted scope was the solar panel load profile analysis rather than regional grid reliability assessment." ; proeth:confidence "0.93" ; proeth:discoveredincase "73" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-25T23:35:16.556086+00:00" ; proeth:firstdiscoveredincase "73" ; proeth:generatedattime "2026-02-25T23:35:16.556086+00:00" ; proeth:importance "high" ; proeth:interpretation "The faithful agent relationship encompasses the organization's overall project welfare; the rolling blackout risk threatens the viability and wisdom of the solar project decision, and therefore falls within Engineer A's notification obligation even though it arose outside the contracted scope." ; proeth:invokedby "Engineer A Energy Systems Reporting Engineer" ; proeth:principleclass "Faithful Agent Notification Obligation for Project Success Risk" ; proeth:sourcetext "Engineer A learns that the utility resource planners reviewed their current generation mix and believe that during extreme weather events, they may be forced to institute rolling outages to keep system generating facilities on-line." ; proeth:tensionresolution "Faithful agent obligation extends beyond literal contracted scope to encompass risks that affect the client's overall project welfare; Engineer A must include the utility's rolling blackout assessment in the board report." ; proeth:textreferences "Engineer A is preparing a report that will be presented to the board to consider the new solar project.", "Engineer A learns that the utility resource planners reviewed their current generation mix and believe that during extreme weather events, they may be forced to institute rolling outages to keep system generating facilities on-line." ; proeth:wasattributedto "Case 73 Extraction" ; prov:generatedAtTime "2026-02-25T23:54:19.975159"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 73 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
73
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-25T23:35:16.556086+00:00
First case
73
Generated
2026-02-25T23:35:16.556086+00:00
Attributed to
Case 73 Extraction
Generated
2026-02-25T23:54:19.975159
Generated by
ProEthica Case 73 Extraction