Fact-Based Disclosure Obligation Invoked By Engineer A Utility Assessment
P · Principle
Individual
http://proethica.org/ontology/case/73#Fact-Based_Disclosure_Obligation_Invoked_By_Engineer_A_Utility_Assessment
Properties
Instance of
Fact-BasedDisclosureObligation
http://proethica.org/ontology/intermediate#Fact-BasedDisclosureObligation
Applied to
Board report on solar panel replacement decision
Local Electric Utility Resource Planner
Balancing with
Avoiding premature alarm
Stakeholder preferences for unqualified endorsement
Concrete expression
The utility resource planner's rolling blackout assessment constitutes a completed professional assessment communicated by qualified professionals, meeting the factual grounding threshold for inclusion in Engineer A's board report.
Confidence
0.9
Importance
high
Interpretation
The utility resource planner's assessment is not speculation but a professional evaluation communicated by the utility's own planners; this meets the factual grounding requirement for disclosure in the board report.
Invoked by
Engineer A Energy Systems Reporting Engineer
Tension resolution
The utility resource planner's professional assessment meets the factual grounding threshold; Engineer A must include it in the board report rather than dismissing it as too speculative.
Source Evidence
Source text
Engineer A learns that the utility resource planners reviewed their current generation mix and believe that during extreme weather events, they may be forced to institute rolling outages to keep system generating facilities on-line.
Text references
Engineer A learns that the utility resource planners reviewed their current generation mix and believe that during extreme weather events, they may be forced to institute rolling outages to keep system generating facilities on-line.
TTL
@prefix case73: <http://proethica.org/ontology/case/73#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case73:Fact-Based_Disclosure_Obligation_Invoked_By_Engineer_A_Utility_Assessment a proeth:Fact-BasedDisclosureObligation,
owl:NamedIndividual ;
rdfs:label "Fact-Based Disclosure Obligation Invoked By Engineer A Utility Assessment" ;
proeth:appliedto "Board report on solar panel replacement decision",
"Local Electric Utility Resource Planner" ;
proeth:balancingwith "Avoiding premature alarm",
"Stakeholder preferences for unqualified endorsement" ;
proeth:conceptCategory "Principle" ;
proeth:concreteexpression "The utility resource planner's rolling blackout assessment constitutes a completed professional assessment communicated by qualified professionals, meeting the factual grounding threshold for inclusion in Engineer A's board report." ;
proeth:confidence "0.9" ;
proeth:discoveredincase "73" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-25T23:35:16.556086+00:00" ;
proeth:firstdiscoveredincase "73" ;
proeth:generatedattime "2026-02-25T23:35:16.556086+00:00" ;
proeth:importance "high" ;
proeth:interpretation "The utility resource planner's assessment is not speculation but a professional evaluation communicated by the utility's own planners; this meets the factual grounding requirement for disclosure in the board report." ;
proeth:invokedby "Engineer A Energy Systems Reporting Engineer" ;
proeth:principleclass "Fact-Based Disclosure Obligation" ;
proeth:sourcetext "Engineer A learns that the utility resource planners reviewed their current generation mix and believe that during extreme weather events, they may be forced to institute rolling outages to keep system generating facilities on-line." ;
proeth:tensionresolution "The utility resource planner's professional assessment meets the factual grounding threshold; Engineer A must include it in the board report rather than dismissing it as too speculative." ;
proeth:textreferences "Engineer A learns that the utility resource planners reviewed their current generation mix and believe that during extreme weather events, they may be forced to institute rolling outages to keep system generating facilities on-line." ;
proeth:wasattributedto "Case 73 Extraction" ;
prov:generatedAtTime "2026-02-25T23:54:19.975635"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 73 Extraction" .
Metadata
Extraction details
Discovered in case
73
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-25T23:35:16.556086+00:00
First case
73
Generated
2026-02-25T23:35:16.556086+00:00
Attributed to
Case 73 Extraction
Generated
2026-02-25T23:54:19.975635
Generated by
ProEthica Case 73 Extraction