Completeness and Non-Selectivity Invoked by Engineer A in Board Report Preparation

P · Principle Individual
http://proethica.org/ontology/case/73#Completeness_and_Non-Selectivity_Invoked_by_Engineer_A_in_Board_Report_Preparation
Properties
Instance of
CompletenessandNon-SelectivityinProfessionalAdvisoryOpinions
http://proethica.org/ontology/intermediate#CompletenessandNon-SelectivityinProfessionalAdvisoryOpinions
Applied to
Board report on solar energy replacement project
Organizational Board Decision Authority
Balancing with
Faithful Agent Obligation Within Ethical Limits
Trustee Discretion and Deference Obligation
Concrete expression
Engineer A's board report must present all material information bearing on the solar replacement decision — including the grid stress risk, the reliability gap, and the battery storage constraint — rather than selectively presenting only the information favorable to the stakeholder-preferred solar option, even though Engineer A is personally convinced the solar project is viable when considered in isolation.
Confidence
0.94
Importance
high
Interpretation
The board, as a non-engineer decision-making body, cannot independently assess the completeness of the technical advisory report; Engineer A's professional duty requires presenting all material factors, not just those supporting the preferred outcome.
Invoked by
Engineer A
Tension resolution
Completeness requires including the grid reliability risk and utility planner assessment even though this information may complicate or delay the board's decision on the carbon footprint reduction initiative.
Source Evidence
Source text
Engineer A is preparing a report that will be presented to the board to consider the new solar project.

Text references
Engineer A also realizes that a move to solar production without storage may stress the local utility generation mix even more, increasing the likelihood of rolling blackouts.
Engineer A is convinced that the solar project, when considered in isolation, is viable and will satisfy those stakeholders interested in reducing the organization's carbon footprint.
Engineer A is preparing a report that will be presented to the board to consider the new solar project.
TTL
@prefix case73: <http://proethica.org/ontology/case/73#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case73:Completeness_and_Non-Selectivity_Invoked_by_Engineer_A_in_Board_Report_Preparation a proeth:CompletenessandNon-SelectivityinProfessionalAdvisoryOpinions, owl:NamedIndividual ; rdfs:label "Completeness and Non-Selectivity Invoked by Engineer A in Board Report Preparation" ; proeth:appliedto "Board report on solar energy replacement project", "Organizational Board Decision Authority" ; proeth:balancingwith "Faithful Agent Obligation Within Ethical Limits", "Trustee Discretion and Deference Obligation" ; proeth:conceptCategory "Principle" ; proeth:concreteexpression "Engineer A's board report must present all material information bearing on the solar replacement decision — including the grid stress risk, the reliability gap, and the battery storage constraint — rather than selectively presenting only the information favorable to the stakeholder-preferred solar option, even though Engineer A is personally convinced the solar project is viable when considered in isolation." ; proeth:confidence "0.94" ; proeth:discoveredincase "73" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-26T22:36:47.519403+00:00" ; proeth:firstdiscoveredincase "73" ; proeth:generatedattime "2026-02-26T22:36:47.519403+00:00" ; proeth:importance "high" ; proeth:interpretation "The board, as a non-engineer decision-making body, cannot independently assess the completeness of the technical advisory report; Engineer A's professional duty requires presenting all material factors, not just those supporting the preferred outcome." ; proeth:invokedby "Engineer A" ; proeth:principleclass "Completeness and Non-Selectivity in Professional Advisory Opinions" ; proeth:sourcetext "Engineer A is preparing a report that will be presented to the board to consider the new solar project." ; proeth:tensionresolution "Completeness requires including the grid reliability risk and utility planner assessment even though this information may complicate or delay the board's decision on the carbon footprint reduction initiative." ; proeth:textreferences "Engineer A also realizes that a move to solar production without storage may stress the local utility generation mix even more, increasing the likelihood of rolling blackouts.", "Engineer A is convinced that the solar project, when considered in isolation, is viable and will satisfy those stakeholders interested in reducing the organization's carbon footprint.", "Engineer A is preparing a report that will be presented to the board to consider the new solar project." ; proeth:wasattributedto "Case 73 Extraction" ; prov:generatedAtTime "2026-02-26T22:54:37.520680"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 73 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
73
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-26T22:36:47.519403+00:00
First case
73
Generated
2026-02-26T22:36:47.519403+00:00
Attributed to
Case 73 Extraction
Generated
2026-02-26T22:54:37.520680
Generated by
ProEthica Case 73 Extraction