Completeness and Non-Selectivity Invoked By Engineer A Board Report
P · Principle
Individual
http://proethica.org/ontology/case/73#Completeness_and_Non-Selectivity_Invoked_By_Engineer_A_Board_Report
Properties
Instance of
CompletenessandNon-SelectivityinProfessionalAdvisoryOpinions
http://proethica.org/ontology/intermediate#CompletenessandNon-SelectivityinProfessionalAdvisoryOpinions
Applied to
Advisory report to organizational board on energy system replacement options
Balancing with
Carbon Footprint Reduction Stakeholder interests
Faithful Agent Obligation Within Ethical Limits
Concrete expression
Engineer A must present the full picture of the solar without storage option — including reliability deficiencies and grid-level impacts — rather than presenting only the energy production equivalence and carbon footprint benefits that favor the stakeholder-preferred option
Confidence
0.96
Importance
high
Interpretation
The board, as a non-engineer decision-making body, cannot independently assess whether the engineer's report is complete; the engineer's obligation to enable informed decision-making requires presenting all material information including unfavorable reliability data
Invoked by
Engineer A Energy Systems Reporting Engineer
Tension resolution
The completeness obligation requires inclusion of reliability data even when stakeholders have expressed a preference for the solar option and even when that data may lead the board to choose the less environmentally friendly alternative
Source Evidence
Source text
A report that does not contain information about the reliability of the utility source will not help them make an informed decision.
Text references
A report that does not contain information about the reliability of the utility source will not help them make an informed decision.
Note that 'equivalent' as used to this point in the discussion has not addressed reliability.
The ethical objective is an informed policy and project decision-making process.
TTL
@prefix case73: <http://proethica.org/ontology/case/73#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case73:Completeness_and_Non-Selectivity_Invoked_By_Engineer_A_Board_Report a proeth:CompletenessandNon-SelectivityinProfessionalAdvisoryOpinions,
owl:NamedIndividual ;
rdfs:label "Completeness and Non-Selectivity Invoked By Engineer A Board Report" ;
proeth:appliedto "Advisory report to organizational board on energy system replacement options" ;
proeth:balancingwith "Carbon Footprint Reduction Stakeholder interests",
"Faithful Agent Obligation Within Ethical Limits" ;
proeth:conceptCategory "Principle" ;
proeth:concreteexpression "Engineer A must present the full picture of the solar without storage option — including reliability deficiencies and grid-level impacts — rather than presenting only the energy production equivalence and carbon footprint benefits that favor the stakeholder-preferred option" ;
proeth:confidence "0.96" ;
proeth:discoveredincase "73" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-25T23:41:15.494672+00:00" ;
proeth:firstdiscoveredincase "73" ;
proeth:generatedattime "2026-02-25T23:41:15.494672+00:00" ;
proeth:importance "high" ;
proeth:interpretation "The board, as a non-engineer decision-making body, cannot independently assess whether the engineer's report is complete; the engineer's obligation to enable informed decision-making requires presenting all material information including unfavorable reliability data" ;
proeth:invokedby "Engineer A Energy Systems Reporting Engineer" ;
proeth:principleclass "Completeness and Non-Selectivity in Professional Advisory Opinions" ;
proeth:sourcetext "A report that does not contain information about the reliability of the utility source will not help them make an informed decision." ;
proeth:tensionresolution "The completeness obligation requires inclusion of reliability data even when stakeholders have expressed a preference for the solar option and even when that data may lead the board to choose the less environmentally friendly alternative" ;
proeth:textreferences "A report that does not contain information about the reliability of the utility source will not help them make an informed decision.",
"Note that 'equivalent' as used to this point in the discussion has not addressed reliability.",
"The ethical objective is an informed policy and project decision-making process." ;
proeth:wasattributedto "Case 73 Extraction" ;
prov:generatedAtTime "2026-02-25T23:54:19.982402"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 73 Extraction" .
Metadata
Extraction details
Discovered in case
73
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-25T23:41:15.494672+00:00
First case
73
Generated
2026-02-25T23:41:15.494672+00:00
Attributed to
Case 73 Extraction
Generated
2026-02-25T23:54:19.982402
Generated by
ProEthica Case 73 Extraction