The pile driving records documented blow counts and penetration depths for all 90 piles. They were central to the dispute: Engineer A's representatives and geotechnical consultant relied on them to argue that 19 piles had been driven to essential refusal, while Engineer B declined to consult them, citing scope limitations and credibility concerns.
Properties
Instance of
Confidence
0.87
Created by
On-site construction personnel and Engineer A's representatives
Document title
Pile Driving Records for 90-Pile Dock Foundation
Used by
Engineer A
Used in context
The pile driving records documented blow counts and penetration depths for all 90 piles. They were central to the dispute: Engineer A's representatives and geotechnical consultant relied on them to argue that 19 piles had been driven to essential refusal, while Engineer B declined to consult them, citing scope limitations and credibility concerns.
Match Confidence
0.0
Matches Existing
false
Synthesis Literal
confidence
createdBy
documentTitle
resourceClass
textReferences
usedInContext
Relationships
availableTo
Agent Engineer A
Source Evidence
Text references
Engineer B did not state anywhere in the report that these 19 piles, according to the pile driving records, had been driven to essential refusal
One expert testified that the pile driving records indicated that many of the piles did not, at the time of initial driving, meet driving resistance sufficient to satisfy the load carrying requirements
We didn't look at the pile driving records because it was not in our scope of work.
We just did not believe the driving records
Source text
One expert testified that the pile driving records indicated that many of the piles did not, at the time of initial driving, meet driving resistance sufficient to satisfy the load carrying requirements
TTL
@prefix case71: <http://proethica.org/ontology/case/71#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix proeth-prov: <http://proethica.org/provenance#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix skos: <http://www.w3.org/2004/02/skos/core#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case71:Project_Pile_Driving_Field_Records a proeth:PileDrivingRecordResource,
owl:NamedIndividual ;
rdfs:label "Project Pile Driving Field Records" ;
proeth-core:availableTo case71:Agent_Engineer_A ;
proeth:conceptCategory "Resource" ;
proeth:confidence "0.87" ;
proeth:createdBy "On-site construction personnel and Engineer A's representatives" ;
proeth:documentTitle "Pile Driving Records for 90-Pile Dock Foundation" ;
proeth:resourceClass "Pile Driving Record Resource" ;
proeth:textReferences "Engineer B did not state anywhere in the report that these 19 piles, according to the pile driving records, had been driven to essential refusal",
"One expert testified that the pile driving records indicated that many of the piles did not, at the time of initial driving, meet driving resistance sufficient to satisfy the load carrying requirements",
"We didn't look at the pile driving records because it was not in our scope of work.",
"We just did not believe the driving records" ;
proeth:usedBy "Engineer A" ;
proeth:usedInContext "The pile driving records documented blow counts and penetration depths for all 90 piles. They were central to the dispute: Engineer A's representatives and geotechnical consultant relied on them to argue that 19 piles had been driven to essential refusal, while Engineer B declined to consult them, citing scope limitations and credibility concerns." ;
proeth-prov:discoveredInCase 71 ;
proeth-prov:discoveredInPass 1 ;
proeth-prov:discoveredInSection "facts" ;
proeth-prov:firstDiscoveredAt "2026-06-04T14:26:23.227248+00:00"^^xsd:dateTime ;
proeth-prov:firstDiscoveredInCase 71 ;
proeth-prov:matchConfidence 0.0 ;
proeth-prov:matchesExisting false ;
proeth-prov:sourceText "One expert testified that the pile driving records indicated that many of the piles did not, at the time of initial driving, meet driving resistance sufficient to satisfy the load carrying requirements" ;
proeth-prov:synthesisLiteral "confidence",
"createdBy",
"documentTitle",
"resourceClass",
"textReferences",
"usedInContext" ;
rdfs:comment "The pile driving records documented blow counts and penetration depths for all 90 piles. They were central to the dispute: Engineer A's representatives and geotechnical consultant relied on them to argue that 19 piles had been driven to essential refusal, while Engineer B declined to consult them, citing scope limitations and credibility concerns." ;
skos:definition "The pile driving records documented blow counts and penetration depths for all 90 piles. They were central to the dispute: Engineer A's representatives and geotechnical consultant relied on them to argue that 19 piles had been driven to essential refusal, while Engineer B declined to consult them, citing scope limitations and credibility concerns." ;
prov:generatedAtTime "2026-06-04T14:26:23.227248+00:00"^^xsd:dateTime ;
prov:wasAttributedTo "Case 71 Extraction",
"claude-sonnet-4-6" ;
prov:wasGeneratedBy "ProEthica Case 71 Extraction" .
Metadata
Extraction details
Discovered in case
71
Discovered in pass
1
Discovered in section
facts
First discovered
2026-06-04T14:26:23.227248+00:00
First case
71
Generated
2026-06-04T14:26:23.227248+00:00
Attributed to
['Case 71 Extraction', 'claude-sonnet-4-6']
Generated by
ProEthica Case 71 Extraction