The original geotechnical firm's report provided the design basis for expected pile set-up strength, predicting that piles would gain sufficient resistance within 30 days of initial driving to meet load-carrying requirements.
Properties
Instance of
GeotechnicalInvestigationReportResource
http://proethica.org/ontology/intermediate#GeotechnicalInvestigationReportResource
Confidence
0.85
Created by
Geotechnical firm retained by Engineer A
Document title
Geotechnical Firm Report on Pile Design and Expected Strength Gain
Used by
Engineer A
Used in context
The original geotechnical firm's report provided the design basis for expected pile set-up strength, predicting that piles would gain sufficient resistance within 30 days of initial driving to meet load-carrying requirements.
Match Confidence
0.0
Matches Existing
false
Synthesis Literal
confidence
createdBy
documentTitle
resourceClass
textReferences
usedInContext
Relationships
availableTo
Agent Engineer A
Source Evidence
Text references
Engineer A testified that the geotechnical firm's report expected that the piles would gain sufficient additional strength within 30 days to meet driving resistance requirements.
Source text
Engineer A testified that the geotechnical firm's report expected that the piles would gain sufficient additional strength within 30 days to meet driving resistance requirements.
TTL
@prefix case71: <http://proethica.org/ontology/case/71#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix proeth-prov: <http://proethica.org/provenance#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix skos: <http://www.w3.org/2004/02/skos/core#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case71:Geotechnical_Firm_Original_Design_Report a proeth:GeotechnicalInvestigationReportResource,
owl:NamedIndividual ;
rdfs:label "Geotechnical Firm Original Design Report" ;
proeth-core:availableTo case71:Agent_Engineer_A ;
proeth:conceptCategory "Resource" ;
proeth:confidence "0.85" ;
proeth:createdBy "Geotechnical firm retained by Engineer A" ;
proeth:documentTitle "Geotechnical Firm Report on Pile Design and Expected Strength Gain" ;
proeth:resourceClass "Geotechnical Investigation Report Resource" ;
proeth:textReferences "Engineer A testified that the geotechnical firm's report expected that the piles would gain sufficient additional strength within 30 days to meet driving resistance requirements." ;
proeth:usedBy "Engineer A" ;
proeth:usedInContext "The original geotechnical firm's report provided the design basis for expected pile set-up strength, predicting that piles would gain sufficient resistance within 30 days of initial driving to meet load-carrying requirements." ;
proeth-prov:discoveredInCase 71 ;
proeth-prov:discoveredInPass 1 ;
proeth-prov:discoveredInSection "facts" ;
proeth-prov:firstDiscoveredAt "2026-06-04T14:26:23.227248+00:00"^^xsd:dateTime ;
proeth-prov:firstDiscoveredInCase 71 ;
proeth-prov:matchConfidence 0.0 ;
proeth-prov:matchesExisting false ;
proeth-prov:sourceText "Engineer A testified that the geotechnical firm's report expected that the piles would gain sufficient additional strength within 30 days to meet driving resistance requirements." ;
proeth-prov:synthesisLiteral "confidence",
"createdBy",
"documentTitle",
"resourceClass",
"textReferences",
"usedInContext" ;
rdfs:comment "The original geotechnical firm's report provided the design basis for expected pile set-up strength, predicting that piles would gain sufficient resistance within 30 days of initial driving to meet load-carrying requirements." ;
skos:definition "The original geotechnical firm's report provided the design basis for expected pile set-up strength, predicting that piles would gain sufficient resistance within 30 days of initial driving to meet load-carrying requirements." ;
prov:generatedAtTime "2026-06-04T14:26:23.227248+00:00"^^xsd:dateTime ;
prov:wasAttributedTo "Case 71 Extraction",
"claude-sonnet-4-6" ;
prov:wasGeneratedBy "ProEthica Case 71 Extraction" .
Metadata
Extraction details
Discovered in case
71
Discovered in pass
1
Discovered in section
facts
First discovered
2026-06-04T14:26:23.227248+00:00
First case
71
Generated
2026-06-04T14:26:23.227248+00:00
Attributed to
['Case 71 Extraction', 'claude-sonnet-4-6']
Generated by
ProEthica Case 71 Extraction