Geotechnical-Firm-Report-Pile-Setup
Individual
b3073859
http://proethica.org/ontology/case/71#Geotechnical-Firm-Report-Pile-Setup
Properties
Parent
Concept Category
Resource
Confidence
0.85
Createdby
Original geotechnical firm retained for the project
Documenttitle
Geotechnical firm's report on pile set-up strength gain
Importance
medium
Resourceclass
Reference Material
Usedby
Engineer A (relied upon in design and testimony); Municipality (basis for test pile program)
Usedincontext
Technical reference establishing the design basis that piles would gain sufficient additional strength within 30 days of initial driving to meet resistance requirements, forming the foundation of Engineer A's design rationale
Source Evidence
Source Text
Engineer A testified that the geotechnical firm's report expected that the piles would gain sufficient additional strength within 30 days to meet driving resistance requirements
Text References
Engineer A testified that the geotechnical firm's report expected that the piles would gain sufficient additional strength within 30 days to meet driving resistance requirements
TTL
@prefix rdf: <http://www.w3.org/1999/02/22-rdf-syntax-ns#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proethica_case_71: <http://proethica.org/ontology/case/71> .
<http://proethica.org/ontology/case/71#Geotechnical-Firm-Report-Pile-Setup> a owl:NamedIndividual ;
rdfs:label "Geotechnical-Firm-Report-Pile-Setup" ;
rdfs:subClassOf <http://proethica.org/ontology/intermediate#ReferenceMaterial> .
Metadata
Ontology
Type
Individual
Content Hash
b30738591b55443a...Last Updated
2026-03-08 16:29
Extraction Provenance
Discovered in Case
71
Discovered in Pass
1
Discovered in Section
facts
First Discovered
2026-02-26T11:12:38.004872+00:00
First Case
71
Generated
2026-02-26T11:12:38.004872+00:00
Attributed To
Case 71 Extraction
Generated
2026-02-26T11:37:51.633460
Generated By
ProEthica Case 71 Extraction