Construction Completion
E · Event
Individual
http://proethica.org/ontology/case/71#Construction_Completion
Definition
The dock supported by 90 piles was constructed according to Engineer A's design, completing the physical work that later became the subject of dispute.
Properties
Instance of
Causes State Change
Dock structure existed in the physical world; contractor performance obligations were discharged; basis for claims and disputes became available.
Event Type
outcome
Initiates Text
Dock Operational State
Post-Construction Liability Exposure
Severity
routine
Temporal Extent
interval
Temporal Marker
After design phase, before contractor claim
Temporal Sequence
2
Terminates Text
Active Construction State
Synthesis Literal
causesStateChange
description
eventType
severity
temporalExtent
temporalMarker
temporalSequence
TTL
@prefix case71: <http://proethica.org/ontology/case/71#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix proeth-prov: <http://proethica.org/provenance#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix time: <http://www.w3.org/2006/time#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case71:Construction_Completion a proeth-core:Event,
owl:NamedIndividual ;
rdfs:label "Construction Completion" ;
proeth:causedByAction case71:Foundation_Design_Decision ;
proeth:causesStateChange "Dock structure existed in the physical world; contractor performance obligations were discharged; basis for claims and disputes became available." ;
proeth:conceptCategory "Event" ;
proeth:eventType "outcome" ;
proeth:initiatesText "Dock Operational State",
"Post-Construction Liability Exposure" ;
proeth:severity "routine" ;
proeth:temporalExtent "interval" ;
proeth:temporalMarker "After design phase, before contractor claim" ;
proeth:temporalSequence 2 ;
proeth:terminatesText "Active Construction State" ;
proeth-prov:synthesisLiteral "causesStateChange",
"description",
"eventType",
"severity",
"temporalExtent",
"temporalMarker",
"temporalSequence" ;
rdfs:comment "The dock supported by 90 piles was constructed according to Engineer A's design, completing the physical work that later became the subject of dispute." ;
time:hasTime case71:time_Construction_Completion ;
prov:wasAttributedTo "claude-sonnet-4-6" ;
prov:wasGeneratedBy "ProEthica Case 71 Extraction" .
Metadata
Extraction details
Attributed to
claude-sonnet-4-6
Generated by
ProEthica Case 71 Extraction