Public-Infrastructure-Cost-Allocation-Standard
Rs · Resource
Individual
http://proethica.org/ontology/case/58#Public-Infrastructure-Cost-Allocation-Standard
Properties
Instance of
PublicInfrastructureCostAllocationStandard
http://proethica.org/ontology/intermediate#PublicInfrastructureCostAllocationStandard
Confidence
0.85
Created by
Professional engineering norms and DOT administrative practice
Document title
Public Infrastructure Cost Allocation Standard
Importance
high
Used by
Engineer W and Engineer Intern D in evaluating the ethical permissibility of the proposed design revision
Used in context
Establishes the professional norm prohibiting engineers from deliberately designing projects to artificially create utility conflicts in order to circumvent cost-allocation policies, grounding the ethical analysis of Engineer W's instruction to revise the design to impact the water main
Version
Current professional norms
Source Evidence
Source text
Engineer W conveys to Engineer Intern D in an indirect way that the design should be revised so that the old water main is impacted
Text references
Engineer W conveys to Engineer Intern D in an indirect way that the design should be revised so that the old water main is impacted
the cost to Shadyvale would be only the difference in price between the existing size of the water main and the proposed larger size, rather than the entire water main replacement cost
TTL
@prefix case58: <http://proethica.org/ontology/case/58#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case58:Public-Infrastructure-Cost-Allocation-Standard a proeth:PublicInfrastructureCostAllocationStandard,
owl:NamedIndividual ;
rdfs:label "Public-Infrastructure-Cost-Allocation-Standard" ;
proeth:conceptCategory "Resource" ;
proeth:confidence "0.85" ;
proeth:createdby "Professional engineering norms and DOT administrative practice" ;
proeth:discoveredincase "58" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:documenttitle "Public Infrastructure Cost Allocation Standard" ;
proeth:firstdiscoveredat "2026-02-25T21:46:17.448016+00:00" ;
proeth:firstdiscoveredincase "58" ;
proeth:generatedattime "2026-02-25T21:46:17.448016+00:00" ;
proeth:importance "high" ;
proeth:resourceclass "Public Infrastructure Cost Allocation Standard" ;
proeth:sourcetext "Engineer W conveys to Engineer Intern D in an indirect way that the design should be revised so that the old water main is impacted" ;
proeth:textreferences "Engineer W conveys to Engineer Intern D in an indirect way that the design should be revised so that the old water main is impacted",
"the cost to Shadyvale would be only the difference in price between the existing size of the water main and the proposed larger size, rather than the entire water main replacement cost" ;
proeth:usedby "Engineer W and Engineer Intern D in evaluating the ethical permissibility of the proposed design revision" ;
proeth:usedincontext "Establishes the professional norm prohibiting engineers from deliberately designing projects to artificially create utility conflicts in order to circumvent cost-allocation policies, grounding the ethical analysis of Engineer W's instruction to revise the design to impact the water main" ;
proeth:version "Current professional norms" ;
proeth:wasattributedto "Case 58 Extraction" ;
prov:generatedAtTime "2026-02-25T22:07:12.194713"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 58 Extraction" .
Metadata
Extraction details
Discovered in case
58
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-25T21:46:17.448016+00:00
First case
58
Generated
2026-02-25T21:46:17.448016+00:00
Attributed to
Case 58 Extraction
Generated
2026-02-25T22:07:12.194713
Generated by
ProEthica Case 58 Extraction