Engineer K Public Safety at Risk State Instance

S · State Individual
http://proethica.org/ontology/case/4#Engineer_K_Public_Safety_at_Risk_State_Instance
Properties
Instance of
PublicSafetyatRisk
http://proethica.org/ontology/intermediate#PublicSafetyatRisk
Active period
Throughout the entire engagement from design through construction and operation
Affected parties
City of [unnamed]
Engineer K
Underserved community
Urban area residents
Confidence
0.95
Importance
high
Subject
Engineer K's primary obligation context — designing a flood control system to protect a rapidly growing urban area
Terminated by
Successful completion and operation of the flood control system
Triggering event
City's engagement of Engineer K to design a flood control system for a rapidly growing urban area facing flood risk
Urgency level
high
Source Evidence
Source text
Engineer K is hired by the City with a specific task in mind—design a new flood control system to protect a rapidly growing urban area

Text references
Engineer K is hired by the City with a specific task in mind—design a new flood control system to protect a rapidly growing urban area
the goal of the completed system will be to protect the public health, safety, and welfare
TTL
@prefix case4: <http://proethica.org/ontology/case/4#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case4:Engineer_K_Public_Safety_at_Risk_State_Instance a proeth:PublicSafetyatRisk, owl:NamedIndividual ; rdfs:label "Engineer K Public Safety at Risk State Instance" ; proeth:activeperiod "Throughout the entire engagement from design through construction and operation" ; proeth:affectedparties "City of [unnamed]", "Engineer K", "Underserved community", "Urban area residents" ; proeth:conceptCategory "State" ; proeth:confidence "0.95" ; proeth:discoveredincase "4" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-24T14:28:25.256969+00:00" ; proeth:firstdiscoveredincase "4" ; proeth:generatedattime "2026-02-24T14:28:25.256969+00:00" ; proeth:importance "high" ; proeth:sourcetext "Engineer K is hired by the City with a specific task in mind—design a new flood control system to protect a rapidly growing urban area" ; proeth:stateclass "Public Safety at Risk" ; proeth:subject "Engineer K's primary obligation context — designing a flood control system to protect a rapidly growing urban area" ; proeth:terminatedby "Successful completion and operation of the flood control system" ; proeth:textreferences "Engineer K is hired by the City with a specific task in mind—design a new flood control system to protect a rapidly growing urban area", "the goal of the completed system will be to protect the public health, safety, and welfare" ; proeth:triggeringevent "City's engagement of Engineer K to design a flood control system for a rapidly growing urban area facing flood risk" ; proeth:urgencylevel "high" ; proeth:wasattributedto "Case 4 Extraction" ; prov:generatedAtTime "2026-02-24T14:47:31.243637"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 4 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:25
Discovered in case
4
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-24T14:28:25.256969+00:00
First case
4
Generated
2026-02-24T14:28:25.256969+00:00
Attributed to
Case 4 Extraction
Generated
2026-02-24T14:47:31.243637
Generated by
ProEthica Case 4 Extraction