Engineer K Project Success Notification Flood Control System Functionality
O · Obligation
Individual
http://proethica.org/ontology/case/4#Engineer_K_Project_Success_Notification_Flood_Control_System_Functionality
Properties
Instance of
ProjectSuccessNotificationObligation
http://proethica.org/ontology/intermediate#ProjectSuccessNotificationObligation
Case context
The BER noted that any non-functional design brings into play the obligation to advise a client or employer if a project will not be successful under Code section III.1.b, in the context of Engineer K's flood control system design.
Compliance status
unclear
Confidence
0.85
Importance
medium
Obligated party
Engineer K
Obligation statement
Engineer K was obligated to advise the City if the proposed flood control system design would not be successful — including not only structural and economic success but also safety outcomes for the public — consistent with NSPE Code III.1.b.
Temporal scope
Throughout design development and upon identification of any design deficiency that would render the system non-functional or unsafe
Relationships
defeasibleUnder
City Refusal to Mitigate Underserved Community Risk
derivedFromPrinciple
Public Welfare Paramount Invoked in Flood Control System Design
Source Evidence
Source text
Certainly, the system should be functional; any non-functional design brings into play the obligation to advise a client or employer if a project will not be successful under Code section III.1.b.
Text references
Certainly, the system should be functional; any non-functional design brings into play the obligation to advise a client or employer if a project will not be successful under Code section III.1.b.
TTL
@prefix case4: <http://proethica.org/ontology/case/4#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case4:Engineer_K_Project_Success_Notification_Flood_Control_System_Functionality a proeth:ProjectSuccessNotificationObligation,
owl:NamedIndividual ;
rdfs:label "Engineer K Project Success Notification Flood Control System Functionality" ;
proeth-core:defeasibleUnder case4:City_Refusal_to_Mitigate_Underserved_Community_Risk ;
proeth:casecontext "The BER noted that any non-functional design brings into play the obligation to advise a client or employer if a project will not be successful under Code section III.1.b, in the context of Engineer K's flood control system design." ;
proeth:compliancestatus "unclear" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.85" ;
proeth:derivedFromPrinciple case4:Public_Welfare_Paramount_Invoked_in_Flood_Control_System_Design ;
proeth:discoveredincase "4" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-24T14:37:31.489601+00:00" ;
proeth:firstdiscoveredincase "4" ;
proeth:generatedattime "2026-02-24T14:37:31.489601+00:00" ;
proeth:importance "medium" ;
proeth:obligatedparty "Engineer K" ;
proeth:obligationclass "Project Success Notification Obligation" ;
proeth:obligationstatement "Engineer K was obligated to advise the City if the proposed flood control system design would not be successful — including not only structural and economic success but also safety outcomes for the public — consistent with NSPE Code III.1.b." ;
proeth:sourcetext "Certainly, the system should be functional; any non-functional design brings into play the obligation to advise a client or employer if a project will not be successful under Code section III.1.b." ;
proeth:temporalscope "Throughout design development and upon identification of any design deficiency that would render the system non-functional or unsafe" ;
proeth:textreferences "Certainly, the system should be functional; any non-functional design brings into play the obligation to advise a client or employer if a project will not be successful under Code section III.1.b." ;
proeth:wasattributedto "Case 4 Extraction" ;
prov:generatedAtTime "2026-02-24T14:47:31.438066"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 4 Extraction" .
Metadata
Extraction details
Discovered in case
4
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-24T14:37:31.489601+00:00
First case
4
Generated
2026-02-24T14:37:31.489601+00:00
Attributed to
Case 4 Extraction
Generated
2026-02-24T14:47:31.438066
Generated by
ProEthica Case 4 Extraction