Engineer D provided as-built drawings to successful contractors after contract award, creating a class of contractors with prior knowledge of the drawings who then began requesting them pre-bid, while other contractors remained uninformed of their availability.
Compliance status
unmet
Confidence
0.95
Importance
high
Obligated party
Engineer D
Obligation statement
Engineer D was obligated to refrain from providing as-built drawings selectively to successful contractors after award while withholding them from other bidders, and subsequently to refrain from providing them informally to pre-bid requesters on a selective basis, recognizing that such selective disclosure compromises procurement integrity.
Temporal scope
From the point of first post-award disclosure onward, and continuing as pre-bid requests began to emerge
Source Evidence
Source text
After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings.

Text references
After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings.
Over time, sprinkler contractors who received as-built drawings from Engineer D in the past begin to ask for these documents when projects are advertised, before bids are turned in.
TTL
@prefix case22: <http://proethica.org/ontology/case/22#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case22:Pre-Bid_Selective_Information_Sharing_Prohibition_Engineer_D_Post-Award_Disclosure a proeth:Pre-BidSelectiveInformationSharingProhibitionObligation, owl:NamedIndividual ; rdfs:label "Pre-Bid Selective Information Sharing Prohibition Engineer D Post-Award Disclosure" ; proeth-core:competesWith case22:Equal_Pre-Bid_Information_Access_Enforcement_Engineer_D_Pre-Bid_Request_Pattern ; proeth-core:defeasibleUnder case22:Selective_Pre-Bid_Information_Sharing_Risk ; proeth-core:prevailsOver case22:Engineer_D_Faithful_Agent_Obligation_State_Agency_Fire_Protection ; proeth:casecontext "Engineer D provided as-built drawings to successful contractors after contract award, creating a class of contractors with prior knowledge of the drawings who then began requesting them pre-bid, while other contractors remained uninformed of their availability." ; proeth:compliancestatus "unmet" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.95" ; proeth:derivedFromPrinciple case22:Equal_Access_to_Bid_Information_Violated_By_Post-Award_Informal_Disclosure, case22:Procurement_Integrity_Invoked_In_Public_Agency_Bid_Process ; proeth:discoveredincase "22" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-25T19:56:04.852603+00:00" ; proeth:firstdiscoveredincase "22" ; proeth:generatedattime "2026-02-25T19:56:04.852603+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Engineer D" ; proeth:obligationclass "Pre-Bid Selective Information Sharing Prohibition Obligation" ; proeth:obligationstatement "Engineer D was obligated to refrain from providing as-built drawings selectively to successful contractors after award while withholding them from other bidders, and subsequently to refrain from providing them informally to pre-bid requesters on a selective basis, recognizing that such selective disclosure compromises procurement integrity." ; proeth:sourcetext "After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings." ; proeth:temporalscope "From the point of first post-award disclosure onward, and continuing as pre-bid requests began to emerge" ; proeth:textreferences "After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings.", "Over time, sprinkler contractors who received as-built drawings from Engineer D in the past begin to ask for these documents when projects are advertised, before bids are turned in." ; proeth:wasattributedto "Case 22 Extraction" ; prov:generatedAtTime "2026-02-25T20:07:58.296112"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
22
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-25T19:56:04.852603+00:00
First case
22
Generated
2026-02-25T19:56:04.852603+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.296112
Generated by
ProEthica Case 22 Extraction