Pre-Bid Selective Information Sharing Prohibition Engineer D Post-Award Disclosure
O · Obligation
Individual
http://proethica.org/ontology/case/22#Pre-Bid_Selective_Information_Sharing_Prohibition_Engineer_D_Post-Award_Disclosure
Properties
Instance of
Pre-BidSelectiveInformationSharingProhibitionObligation
http://proethica.org/ontology/intermediate#Pre-BidSelectiveInformationSharingProhibitionObligation
Case context
Engineer D provided as-built drawings to successful contractors after contract award, creating a class of contractors with prior knowledge of the drawings who then began requesting them pre-bid, while other contractors remained uninformed of their availability.
Compliance status
unmet
Confidence
0.95
Importance
high
Obligated party
Engineer D
Obligation statement
Engineer D was obligated to refrain from providing as-built drawings selectively to successful contractors after award while withholding them from other bidders, and subsequently to refrain from providing them informally to pre-bid requesters on a selective basis, recognizing that such selective disclosure compromises procurement integrity.
Temporal scope
From the point of first post-award disclosure onward, and continuing as pre-bid requests began to emerge
Relationships
defeasibleUnder
Selective Pre-Bid Information Sharing Risk
Source Evidence
Source text
After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings.
Text references
After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings.
Over time, sprinkler contractors who received as-built drawings from Engineer D in the past begin to ask for these documents when projects are advertised, before bids are turned in.
TTL
@prefix case22: <http://proethica.org/ontology/case/22#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case22:Pre-Bid_Selective_Information_Sharing_Prohibition_Engineer_D_Post-Award_Disclosure a proeth:Pre-BidSelectiveInformationSharingProhibitionObligation,
owl:NamedIndividual ;
rdfs:label "Pre-Bid Selective Information Sharing Prohibition Engineer D Post-Award Disclosure" ;
proeth-core:competesWith case22:Equal_Pre-Bid_Information_Access_Enforcement_Engineer_D_Pre-Bid_Request_Pattern ;
proeth-core:defeasibleUnder case22:Selective_Pre-Bid_Information_Sharing_Risk ;
proeth-core:prevailsOver case22:Engineer_D_Faithful_Agent_Obligation_State_Agency_Fire_Protection ;
proeth:casecontext "Engineer D provided as-built drawings to successful contractors after contract award, creating a class of contractors with prior knowledge of the drawings who then began requesting them pre-bid, while other contractors remained uninformed of their availability." ;
proeth:compliancestatus "unmet" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.95" ;
proeth:derivedFromPrinciple case22:Equal_Access_to_Bid_Information_Violated_By_Post-Award_Informal_Disclosure,
case22:Procurement_Integrity_Invoked_In_Public_Agency_Bid_Process ;
proeth:discoveredincase "22" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-25T19:56:04.852603+00:00" ;
proeth:firstdiscoveredincase "22" ;
proeth:generatedattime "2026-02-25T19:56:04.852603+00:00" ;
proeth:importance "high" ;
proeth:obligatedparty "Engineer D" ;
proeth:obligationclass "Pre-Bid Selective Information Sharing Prohibition Obligation" ;
proeth:obligationstatement "Engineer D was obligated to refrain from providing as-built drawings selectively to successful contractors after award while withholding them from other bidders, and subsequently to refrain from providing them informally to pre-bid requesters on a selective basis, recognizing that such selective disclosure compromises procurement integrity." ;
proeth:sourcetext "After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings." ;
proeth:temporalscope "From the point of first post-award disclosure onward, and continuing as pre-bid requests began to emerge" ;
proeth:textreferences "After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system. D provides the drawings.",
"Over time, sprinkler contractors who received as-built drawings from Engineer D in the past begin to ask for these documents when projects are advertised, before bids are turned in." ;
proeth:wasattributedto "Case 22 Extraction" ;
prov:generatedAtTime "2026-02-25T20:07:58.296112"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Extraction details
Discovered in case
22
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-25T19:56:04.852603+00:00
First case
22
Generated
2026-02-25T19:56:04.852603+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.296112
Generated by
ProEthica Case 22 Extraction