A successful sprinkler contractor who, after being awarded a contract for a major building renovation project, requests as-built drawings of the existing sprinkler system from Engineer D to support compliant installation work. This post-award request is the initial and arguably legitimate form of the information-seeking behavior that later evolves into pre-bid requests.

Properties
Instance of
SprinklerContractorDocumentationRequester
http://proethica.org/ontology/intermediate#SprinklerContractorDocumentationRequester
Attributes
timingPost-award, post-bid-opening
purposeSupport compliant sprinkler installation under awarded contract
procurement_stageConstruction phase
Confidence
0.88
Importance
medium
Relationships
typecontractor
targetState Public Agency
typeinformation_requester
targetEngineer D Public Sector Fire Protection Engineer
Role category
stakeholder
Source Evidence
Source text
After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system

Text references
After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system
D provides the drawings
TTL
@prefix case22: <http://proethica.org/ontology/case/22#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case22:Post-Award_Sprinkler_Contractor_Documentation_Requester a proeth:SprinklerContractorDocumentationRequester, owl:NamedIndividual ; rdfs:label "Post-Award Sprinkler Contractor Documentation Requester" ; proeth:attributes "{'timing': 'Post-award, post-bid-opening', 'purpose': 'Support compliant sprinkler installation under awarded contract', 'procurement_stage': 'Construction phase'}" ; proeth:caseinvolvement "A successful sprinkler contractor who, after being awarded a contract for a major building renovation project, requests as-built drawings of the existing sprinkler system from Engineer D to support compliant installation work. This post-award request is the initial and arguably legitimate form of the information-seeking behavior that later evolves into pre-bid requests." ; proeth:conceptCategory "Role" ; proeth:confidence "0.88" ; proeth:discoveredincase "22" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-02-25T19:52:14.985042+00:00" ; proeth:firstdiscoveredincase "22" ; proeth:generatedattime "2026-02-25T19:52:14.985042+00:00" ; proeth:importance "medium" ; proeth:relationships "{'type': 'contractor', 'target': 'State Public Agency'}", "{'type': 'information_requester', 'target': 'Engineer D Public Sector Fire Protection Engineer'}" ; proeth:rolecategory "stakeholder" ; proeth:roleclass "Sprinkler Contractor Documentation Requester" ; proeth:sourcetext "After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system" ; proeth:textreferences "After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system", "D provides the drawings" ; proeth:wasattributedto "Case 22 Extraction" ; prov:generatedAtTime "2026-02-25T20:07:58.290080"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
22
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-25T19:52:14.985042+00:00
First case
22
Generated
2026-02-25T19:52:14.985042+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.290080
Generated by
ProEthica Case 22 Extraction