Post-Award As-Built Sharing — Faithful Agent and Confidentiality Analysis
S · State
Individual
http://proethica.org/ontology/case/22#Post-Award_As-Built_Sharing_—_Faithful_Agent_and_Confidentiality_Analysis
Properties
Instance of
Post-AwardAs-BuiltDisclosureState
http://proethica.org/ontology/intermediate#Post-AwardAs-BuiltDisclosureState
Active period
From Engineer D's initial post-award sharing of as-built drawings through the present case analysis
Affected parties
Engineer D
Future bidders
Public agency employer
Successful contractors
Confidence
0.92
Importance
high
Subject
Engineer D's sharing of as-built drawings with contractors after bid opening and contract award, without formal employer authorization
Terminated by
Formal employer-sanctioned process established for as-built disclosure
Triggering event
Engineer D providing as-built drawings to contractors after bid openings to improve design quality, without formal employer permission or standard process
Urgency level
medium
Source Evidence
Source text
When D provides as-built drawings after bid openings, is employer information being shared without consent?
Text references
Engineer D's efforts to make as-built drawings available for reference appears to be acting in the employer's best interest
When D provides as-built drawings after bid openings, is employer information being shared without consent?
TTL
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
<http://proethica.org/ontology/case/22#Post-Award_As-Built_Sharing_—_Faithful_Agent_and_Confidentiality_Analysis> a proeth:Post-AwardAs-BuiltDisclosureState,
owl:NamedIndividual ;
rdfs:label "Post-Award As-Built Sharing — Faithful Agent and Confidentiality Analysis" ;
proeth:activeperiod "From Engineer D's initial post-award sharing of as-built drawings through the present case analysis" ;
proeth:affectedparties "Engineer D",
"Future bidders",
"Public agency employer",
"Successful contractors" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.92" ;
proeth:discoveredincase "22" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-25T19:53:06.075243+00:00" ;
proeth:firstdiscoveredincase "22" ;
proeth:generatedattime "2026-02-25T19:53:06.075243+00:00" ;
proeth:importance "high" ;
proeth:sourcetext "When D provides as-built drawings after bid openings, is employer information being shared without consent?" ;
proeth:stateclass "Post-Award As-Built Disclosure State" ;
proeth:subject "Engineer D's sharing of as-built drawings with contractors after bid opening and contract award, without formal employer authorization" ;
proeth:terminatedby "Formal employer-sanctioned process established for as-built disclosure" ;
proeth:textreferences "Engineer D's efforts to make as-built drawings available for reference appears to be acting in the employer's best interest",
"When D provides as-built drawings after bid openings, is employer information being shared without consent?" ;
proeth:triggeringevent "Engineer D providing as-built drawings to contractors after bid openings to improve design quality, without formal employer permission or standard process" ;
proeth:urgencylevel "medium" ;
proeth:wasattributedto "Case 22 Extraction" ;
prov:generatedAtTime "2026-02-25T20:07:58.294233"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Extraction details
Discovered in case
22
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-25T19:53:06.075243+00:00
First case
22
Generated
2026-02-25T19:53:06.075243+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.294233
Generated by
ProEthica Case 22 Extraction