Informal Pre-Bid As-Built Request Pattern — Selective Pre-Bid Sharing Risk

S · State Individual
http://proethica.org/ontology/case/22#Informal_Pre-Bid_As-Built_Request_Pattern_—_Selective_Pre-Bid_Sharing_Risk
Properties
Instance of
SelectivePre-BidInformationSharingState
http://proethica.org/ontology/intermediate#SelectivePre-BidInformationSharingState
Active period
From the point contractors began requesting as-built drawings pre-bid through resolution via formal process establishment
Affected parties
Contractors with prior project experience
Contractors without prior project experience
Engineer D
General public
Public agency
Confidence
0.88
Importance
high
Subject
Pattern of contractors requesting as-built drawings before bid submission, creating risk of selective pre-bid information sharing by Engineer D
Terminated by
Formal process established making as-built drawings available to all prospective bidders through official channels
Triggering event
Contractors with prior project experience learning that as-built drawings are available and requesting them before bids are submitted on future projects
Urgency level
high
Source Evidence
Source text
It would be unethical for D to share as-builts with selected contractors pre-bid

Text references
It would be unethical for D to share as-builts with selected contractors pre-bid
if information is shared selectively with contractors before bids are opened; will D's actions influence the award of a contract?
TTL
@prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . <http://proethica.org/ontology/case/22#Informal_Pre-Bid_As-Built_Request_Pattern_—_Selective_Pre-Bid_Sharing_Risk> a proeth:SelectivePre-BidInformationSharingState, owl:NamedIndividual ; rdfs:label "Informal Pre-Bid As-Built Request Pattern — Selective Pre-Bid Sharing Risk" ; proeth:activeperiod "From the point contractors began requesting as-built drawings pre-bid through resolution via formal process establishment" ; proeth:affectedparties "Contractors with prior project experience", "Contractors without prior project experience", "Engineer D", "General public", "Public agency" ; proeth:conceptCategory "State" ; proeth:confidence "0.88" ; proeth:discoveredincase "22" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-25T19:53:06.075243+00:00" ; proeth:firstdiscoveredincase "22" ; proeth:generatedattime "2026-02-25T19:53:06.075243+00:00" ; proeth:importance "high" ; proeth:sourcetext "It would be unethical for D to share as-builts with selected contractors pre-bid" ; proeth:stateclass "Selective Pre-Bid Information Sharing State" ; proeth:subject "Pattern of contractors requesting as-built drawings before bid submission, creating risk of selective pre-bid information sharing by Engineer D" ; proeth:terminatedby "Formal process established making as-built drawings available to all prospective bidders through official channels" ; proeth:textreferences "It would be unethical for D to share as-builts with selected contractors pre-bid", "if information is shared selectively with contractors before bids are opened; will D's actions influence the award of a contract?" ; proeth:triggeringevent "Contractors with prior project experience learning that as-built drawings are available and requesting them before bids are submitted on future projects" ; proeth:urgencylevel "high" ; proeth:wasattributedto "Case 22 Extraction" ; prov:generatedAtTime "2026-02-25T20:07:58.294071"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
22
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-25T19:53:06.075243+00:00
First case
22
Generated
2026-02-25T19:53:06.075243+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.294071
Generated by
ProEthica Case 22 Extraction