Formal Channel Requirement Invoked for Engineer D As-Built Sharing

P · Principle Individual
http://proethica.org/ontology/case/22#Formal_Channel_Requirement_Invoked_for_Engineer_D_As-Built_Sharing
Properties
Instance of
FormalChannelRequirementforInformationSharinginPublicProcurement
http://proethica.org/ontology/intermediate#FormalChannelRequirementforInformationSharinginPublicProcurement
Applied to
As-built drawing requests from sprinkler contractors pre-bid and post-award
Balancing with
Bid Document Completeness and Material Information Disclosure
Faithful Agent Obligation Within Ethical Limits
Concrete expression
Engineer D must direct contractors to request as-built drawings through standard project processes rather than sharing them informally, ensuring institutional authorization governs all information disclosure
Confidence
0.95
Importance
high
Interpretation
The formal channel requirement applies both pre-bid and post-award: even when sharing as-built drawings would improve design quality, the sharing must occur through institutionally sanctioned processes to preserve procurement integrity and equal access
Invoked by
Engineer D Public Sector Fire Protection Engineer
State Agency As-Built Information Custodian
Tension resolution
Engineer D can satisfy both the formal channel requirement and the goal of improving designs by initiating a systemic process to include as-built drawings in bid documents going forward, rather than using informal sharing as a workaround
Source Evidence
Source text
Engineer D can advise that as-built drawings are available, but D should direct subcontractors to request them as part of the standard project process.

Text references
D should not share documents on their own initiative or without formal permission.
Engineer D can advise that as-built drawings are available, but D should direct subcontractors to request them as part of the standard project process.
Working through informal mechanisms on public projects can give the appearance of impropriety or favoritism.
TTL
@prefix case22: <http://proethica.org/ontology/case/22#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case22:Formal_Channel_Requirement_Invoked_for_Engineer_D_As-Built_Sharing a proeth:FormalChannelRequirementforInformationSharinginPublicProcurement, owl:NamedIndividual ; rdfs:label "Formal Channel Requirement Invoked for Engineer D As-Built Sharing" ; proeth:appliedto "As-built drawing requests from sprinkler contractors pre-bid and post-award" ; proeth:balancingwith "Bid Document Completeness and Material Information Disclosure", "Faithful Agent Obligation Within Ethical Limits" ; proeth:conceptCategory "Principle" ; proeth:concreteexpression "Engineer D must direct contractors to request as-built drawings through standard project processes rather than sharing them informally, ensuring institutional authorization governs all information disclosure" ; proeth:confidence "0.95" ; proeth:discoveredincase "22" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "discussion" ; proeth:firstdiscoveredat "2026-02-25T19:58:39.771005+00:00" ; proeth:firstdiscoveredincase "22" ; proeth:generatedattime "2026-02-25T19:58:39.771005+00:00" ; proeth:importance "high" ; proeth:interpretation "The formal channel requirement applies both pre-bid and post-award: even when sharing as-built drawings would improve design quality, the sharing must occur through institutionally sanctioned processes to preserve procurement integrity and equal access" ; proeth:invokedby "Engineer D Public Sector Fire Protection Engineer", "State Agency As-Built Information Custodian" ; proeth:principleclass "Formal Channel Requirement for Information Sharing in Public Procurement" ; proeth:sourcetext "Engineer D can advise that as-built drawings are available, but D should direct subcontractors to request them as part of the standard project process." ; proeth:tensionresolution "Engineer D can satisfy both the formal channel requirement and the goal of improving designs by initiating a systemic process to include as-built drawings in bid documents going forward, rather than using informal sharing as a workaround" ; proeth:textreferences "D should not share documents on their own initiative or without formal permission.", "Engineer D can advise that as-built drawings are available, but D should direct subcontractors to request them as part of the standard project process.", "Working through informal mechanisms on public projects can give the appearance of impropriety or favoritism." ; proeth:wasattributedto "Case 22 Extraction" ; prov:generatedAtTime "2026-02-25T20:07:58.300064"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
22
Discovered in pass
2
Discovered in section
discussion
First discovered
2026-02-25T19:58:39.771005+00:00
First case
22
Generated
2026-02-25T19:58:39.771005+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.300064
Generated by
ProEthica Case 22 Extraction