Engineer D Post-Award As-Built Disclosure
S · State
Individual
http://proethica.org/ontology/case/22#Engineer_D_Post-Award_As-Built_Disclosure
Properties
Instance of
Post-BidAs-BuiltDisclosureState
http://proethica.org/ontology/intermediate#Post-BidAs-BuiltDisclosureState
Active period
From the moment the successful sprinkler contractor requests as-built drawings after bid opening and contract award, through Engineer D's provision of those drawings
Affected parties
Engineer D
Other prospective bidders on future projects
State agency
Successful sprinkler contractor
Confidence
0.85
Importance
high
Subject
Engineer D's provision of as-built sprinkler drawings to successful contractor after contract award
Terminated by
Not explicitly terminated in the facts; persists as a practice pattern
Triggering event
Successful sprinkler contractor requests as-built drawings of existing sprinkler system after bids are opened and contracts are awarded
Urgency level
medium
Source Evidence
Source text
After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system
Text references
After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system
D provides the drawings
the bid documents made no reference to existing as-builts or drawings for the bidders' or awarded contractor's use
TTL
@prefix case22: <http://proethica.org/ontology/case/22#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case22:Engineer_D_Post-Award_As-Built_Disclosure a proeth:Post-BidAs-BuiltDisclosureState,
owl:NamedIndividual ;
rdfs:label "Engineer D Post-Award As-Built Disclosure" ;
proeth:activeperiod "From the moment the successful sprinkler contractor requests as-built drawings after bid opening and contract award, through Engineer D's provision of those drawings" ;
proeth:affectedparties "Engineer D",
"Other prospective bidders on future projects",
"State agency",
"Successful sprinkler contractor" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.85" ;
proeth:discoveredincase "22" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-25T19:52:22.070535+00:00" ;
proeth:firstdiscoveredincase "22" ;
proeth:generatedattime "2026-02-25T19:52:22.070535+00:00" ;
proeth:importance "high" ;
proeth:sourcetext "After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system" ;
proeth:stateclass "Post-Bid As-Built Disclosure State" ;
proeth:subject "Engineer D's provision of as-built sprinkler drawings to successful contractor after contract award" ;
proeth:terminatedby "Not explicitly terminated in the facts; persists as a practice pattern" ;
proeth:textreferences "After bids are opened and contracts are awarded, the successful sprinkler contractor asks Engineer D for as-built drawings of the existing sprinkler system",
"D provides the drawings",
"the bid documents made no reference to existing as-builts or drawings for the bidders' or awarded contractor's use" ;
proeth:triggeringevent "Successful sprinkler contractor requests as-built drawings of existing sprinkler system after bids are opened and contracts are awarded" ;
proeth:urgencylevel "medium" ;
proeth:wasattributedto "Case 22 Extraction" ;
prov:generatedAtTime "2026-02-25T20:07:58.291330"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Extraction details
Discovered in case
22
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-25T19:52:22.070535+00:00
First case
22
Generated
2026-02-25T19:52:22.070535+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.291330
Generated by
ProEthica Case 22 Extraction