Engineer D Informal As-Built Sharing Without Formal Permission
S · State
Individual
http://proethica.org/ontology/case/22#Engineer_D_Informal_As-Built_Sharing_Without_Formal_Permission
Properties
Instance of
InformalAs-BuiltSharingWithoutFormalPermissionState
http://proethica.org/ontology/intermediate#InformalAs-BuiltSharingWithoutFormalPermissionState
Active period
From the point Engineer D began sharing as-built drawings post-award through the present case analysis, and prospectively until a formal process is established
Affected parties
Contractors with prior project experience
Contractors without prior project experience
Engineer D
General public
Public agency employer
Confidence
0.87
Importance
high
Subject
Engineer D's practice of sharing as-built drawings with contractors informally on public projects
Terminated by
Establishment of a formal process to include as-built drawings in standard project documentation and direction of all requests through official channels
Triggering event
Engineer D sharing as-built drawings with contractors after bid opening without formal employer permission or standard process authorization, followed by contractors beginning to request documents pre-bid
Urgency level
medium
Source Evidence
Source text
D should not share documents on their own initiative or without formal permission
Text references
D should not share documents on their own initiative or without formal permission
Engineer D can advise that as-built drawings are available, but D should direct subcontractors to request them as part of the standard project process
It would be unethical for D to share as-builts with selected contractors pre-bid
Working through informal mechanisms on public projects can give the appearance of impropriety or favoritism
TTL
@prefix case22: <http://proethica.org/ontology/case/22#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case22:Engineer_D_Informal_As-Built_Sharing_Without_Formal_Permission a proeth:InformalAs-BuiltSharingWithoutFormalPermissionState,
owl:NamedIndividual ;
rdfs:label "Engineer D Informal As-Built Sharing Without Formal Permission" ;
proeth:activeperiod "From the point Engineer D began sharing as-built drawings post-award through the present case analysis, and prospectively until a formal process is established" ;
proeth:affectedparties "Contractors with prior project experience",
"Contractors without prior project experience",
"Engineer D",
"General public",
"Public agency employer" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.87" ;
proeth:discoveredincase "22" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-25T19:53:06.075243+00:00" ;
proeth:firstdiscoveredincase "22" ;
proeth:generatedattime "2026-02-25T19:53:06.075243+00:00" ;
proeth:importance "high" ;
proeth:sourcetext "D should not share documents on their own initiative or without formal permission" ;
proeth:stateclass "Informal As-Built Sharing Without Formal Permission State" ;
proeth:subject "Engineer D's practice of sharing as-built drawings with contractors informally on public projects" ;
proeth:terminatedby "Establishment of a formal process to include as-built drawings in standard project documentation and direction of all requests through official channels" ;
proeth:textreferences "D should not share documents on their own initiative or without formal permission",
"Engineer D can advise that as-built drawings are available, but D should direct subcontractors to request them as part of the standard project process",
"It would be unethical for D to share as-builts with selected contractors pre-bid",
"Working through informal mechanisms on public projects can give the appearance of impropriety or favoritism" ;
proeth:triggeringevent "Engineer D sharing as-built drawings with contractors after bid opening without formal employer permission or standard process authorization, followed by contractors beginning to request documents pre-bid" ;
proeth:urgencylevel "medium" ;
proeth:wasattributedto "Case 22 Extraction" ;
prov:generatedAtTime "2026-02-25T20:07:58.293586"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Extraction details
Discovered in case
22
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-25T19:53:06.075243+00:00
First case
22
Generated
2026-02-25T19:53:06.075243+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.293586
Generated by
ProEthica Case 22 Extraction