DP3
Individual
c02cfe2a
http://proethica.org/ontology/case/22#DP3
Properties
Parent
Decision Point Id
DP3
Decision Question
When a contractor requests as-built drawings during the pre-bid phase, should Engineer D share them with that contractor, decline to share with anyone pre-bid, or take action to make them equally available to all bidders?
Focus
During the bidding phase for a renovation project, one or more sprinkler contractors contact Engineer D directly and request access to as-built drawings before bids are submitted. Engineer D possesses these drawings and must decide how to respond, knowing that providing them selectively would advantage those contractors over others who did not ask.
Option1
Share as-built drawings with the requesting contractor informally and pre-bid, reasoning that the information improves design quality and the contractor's initiative warrants a response
Option2
Decline to share as-built drawings with the requesting contractor pre-bid and take no further action, leaving the information gap unaddressed for all bidders
Option3
Decline to share as-built drawings selectively with the requesting contractor, and instead immediately escalate to agency procurement officials to issue a formal addendum making the drawings equally available to all prospective bidders before bid submission
Role Label
Engineer D Pre-Bid Selective Information Sharing Prohibition As-Built Drawings
TTL
@prefix rdf: <http://www.w3.org/1999/02/22-rdf-syntax-ns#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proethica_case_22: <http://proethica.org/ontology/case/22> .
<http://proethica.org/ontology/case/22#DP3> a owl:NamedIndividual ;
rdfs:label "DP3" ;
rdfs:subClassOf <http://proethica.org/ontology/cases#DecisionPoint> .
Metadata
Ontology
Type
Individual
Content Hash
c02cfe2ad06247c3...Last Updated
2026-03-08 16:29
Extraction Provenance
Generated
2026-02-25T20:18:49.331345
Generated By
ProEthica Case 22 Extraction