DP2
Individual
8398377e
http://proethica.org/ontology/case/22#DP2
Properties
Parent
Decision Point Id
DP2
Decision Question
When a contractor requests as-built drawings post-award and no formal policy exists, should Engineer D share them informally, withhold them pending formal authorization, or seek employer authorization before sharing?
Focus
After award of a renovation contract, Engineer D is asked by the successful contractor for as-built drawings of the existing sprinkler system. No formal agency policy explicitly authorizes or prohibits sharing these documents. Engineer D must decide how to respond, balancing safety concerns against faithful agent and employer consent obligations.
Option1
Share as-built drawings informally with the awarded contractor immediately, reasoning that safety necessity and good intent justify the disclosure without formal authorization
Option2
Withhold as-built drawings entirely until formal employer authorization is obtained, even if this delays contractor access to safety-critical information
Option3
Seek formal employer authorization to share as-built drawings with the awarded contractor, and simultaneously initiate a process to incorporate them into future bid packages through official channels
Role Label
Faithful Agent Obligation Engineer D State Agency Procurement
TTL
@prefix rdf: <http://www.w3.org/1999/02/22-rdf-syntax-ns#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proethica_case_22: <http://proethica.org/ontology/case/22> .
<http://proethica.org/ontology/case/22#DP2> a owl:NamedIndividual ;
rdfs:label "DP2" ;
rdfs:subClassOf <http://proethica.org/ontology/cases#DecisionPoint> .
Metadata
Ontology
Type
Individual
Content Hash
8398377ed4ef2d39...Last Updated
2026-03-08 16:29
Extraction Provenance
Generated
2026-02-25T20:18:49.331259
Generated By
ProEthica Case 22 Extraction