DP1
Individual
1ce8e41d
http://proethica.org/ontology/case/22#DP1
Properties
Parent
Decision Point Id
DP1
Decision Question
Should Engineer D include as-built drawings for existing sprinkler systems in the bid documents so that all prospective bidders have equal access before submitting bids?
Focus
When preparing bid documents for building renovation projects involving existing sprinkler systems, Engineer D must decide whether to include references to available as-built drawings and make them accessible to all prospective bidders as part of the standard bid package, or to omit them and rely on post-award disclosure.
Option1
Include references to existing as-built drawings in the bid package and make them equally available to all prospective bidders before bid submission
Option2
Omit as-built drawings from bid documents and provide them only to the successful contractor after award on an informal, as-requested basis
Option3
Omit as-built drawings from bid documents but note their existence in a general project description without formally making them available to all bidders
Role Label
Engineer D Bid Document Material Information Inclusion Sprinkler As-Builts
TTL
@prefix rdf: <http://www.w3.org/1999/02/22-rdf-syntax-ns#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proethica_case_22: <http://proethica.org/ontology/case/22> .
<http://proethica.org/ontology/case/22#DP1> a owl:NamedIndividual ;
rdfs:label "DP1" ;
rdfs:subClassOf <http://proethica.org/ontology/cases#DecisionPoint> .
Metadata
Ontology
Type
Individual
Content Hash
1ce8e41d0070a99a...Last Updated
2026-03-08 16:29
Extraction Provenance
Generated
2026-02-25T20:18:49.331145
Generated By
ProEthica Case 22 Extraction