As-Built Drawing Disclosure Standard - Public Project Context

Rs · Resource Individual
http://proethica.org/ontology/case/22#As-Built_Drawing_Disclosure_Standard_-_Public_Project_Context
Properties
Instance of
As-BuiltDrawingDisclosureStandard
http://proethica.org/ontology/intermediate#As-BuiltDrawingDisclosureStandard
Confidence
0.95
Created by
Professional engineering community norms
Document title
As-Built Drawing Disclosure Standard
Importance
high
Used by
Engineer D in determining proper disclosure conduct
Used in context
Applied to evaluate Engineer D's obligations regarding when and how as-built drawings may be shared with contractors on public projects, establishing that informal selective sharing pre-bid is unethical, that formal process-based disclosure is required, and that D should initiate systemic inclusion of as-builts in standard project processes
Version
Current professional norms
Source Evidence
Source text
Engineer D can advise that as-built drawings are available, but D should direct subcontractors to request them as part of the standard project process.

Text references
D should not share documents on their own initiative or without formal permission.
Engineer D can advise that as-built drawings are available, but D should direct subcontractors to request them as part of the standard project process.
It would be unethical for D to share as-builts with selected contractors pre-bid.
TTL
@prefix case22: <http://proethica.org/ontology/case/22#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case22:As-Built_Drawing_Disclosure_Standard_-_Public_Project_Context a proeth:As-BuiltDrawingDisclosureStandard, owl:NamedIndividual ; rdfs:label "As-Built Drawing Disclosure Standard - Public Project Context" ; proeth:conceptCategory "Resource" ; proeth:confidence "0.95" ; proeth:createdby "Professional engineering community norms" ; proeth:discoveredincase "22" ; proeth:discoveredinpass "1" ; proeth:discoveredinsection "discussion" ; proeth:documenttitle "As-Built Drawing Disclosure Standard" ; proeth:firstdiscoveredat "2026-02-25T19:52:51.081790+00:00" ; proeth:firstdiscoveredincase "22" ; proeth:generatedattime "2026-02-25T19:52:51.081790+00:00" ; proeth:importance "high" ; proeth:resourceclass "As-Built Drawing Disclosure Standard" ; proeth:sourcetext "Engineer D can advise that as-built drawings are available, but D should direct subcontractors to request them as part of the standard project process." ; proeth:textreferences "D should not share documents on their own initiative or without formal permission.", "Engineer D can advise that as-built drawings are available, but D should direct subcontractors to request them as part of the standard project process.", "It would be unethical for D to share as-builts with selected contractors pre-bid." ; proeth:usedby "Engineer D in determining proper disclosure conduct" ; proeth:usedincontext "Applied to evaluate Engineer D's obligations regarding when and how as-built drawings may be shared with contractors on public projects, establishing that informal selective sharing pre-bid is unethical, that formal process-based disclosure is required, and that D should initiate systemic inclusion of as-builts in standard project processes" ; proeth:version "Current professional norms" ; proeth:wasattributedto "Case 22 Extraction" ; prov:generatedAtTime "2026-02-25T20:07:58.292617"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 22 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:26
Discovered in case
22
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-25T19:52:51.081790+00:00
First case
22
Generated
2026-02-25T19:52:51.081790+00:00
Attributed to
Case 22 Extraction
Generated
2026-02-25T20:07:58.292617
Generated by
ProEthica Case 22 Extraction