Case context
Engineer B is in the final year of a 3-year consulting engineering contract with City A, during which the City Administrator has questioned Engineer B's judgment on several occasions and is simultaneously coordinating the selection process for the next 3-year contract.
Compliance status
met
Confidence
0.8
Importance
medium
Obligated party
Engineer B
Obligation statement
Engineer B was obligated to continue performing all consulting engineering services for City A faithfully, competently, and in the city's best interests throughout the final year of the active 3-year contract, notwithstanding the City Administrator's repeated questioning of Engineer B's professional judgment and the concurrent contract renewal competition in which Engineer C was participating.
Temporal scope
Throughout the duration of the active 3-year contract, particularly during the final year when competitive and reputational pressures are heightened
Relationships
defeasibleUnder
Engineer B Client Relationship Under Strained Authority
Source Evidence
Source text
Engineer B is currently hired under these contract terms and is in the final year of the 3-year contract.
Text references
Engineer B is currently hired under these contract terms and is in the final year of the 3-year contract.
The City Administrator has questioned the judgment of Engineer B on several occasions during the contract period.
TTL
@prefix case20: <http://proethica.org/ontology/case/20#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix proeth-core: <http://proethica.org/ontology/core#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case20:Engineer_B_Faithful_Performance_Under_Contested_Contract_Obligation_Instance a proeth:IncumbentEngineerFaithfulPerformanceUnderContestedContractObligation,
owl:NamedIndividual ;
rdfs:label "Engineer B Faithful Performance Under Contested Contract Obligation Instance" ;
proeth-core:competesWith case20:Active_Contract_Incumbent_Knowledge_Requirement_Engineer_C_Review_of_Engineer_B ;
proeth-core:defeasibleUnder case20:Engineer_B_Client_Relationship_Under_Strained_Authority ;
proeth:casecontext "Engineer B is in the final year of a 3-year consulting engineering contract with City A, during which the City Administrator has questioned Engineer B's judgment on several occasions and is simultaneously coordinating the selection process for the next 3-year contract." ;
proeth:compliancestatus "met" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.8" ;
proeth:derivedFromPrinciple case20:Faithful_Agent_Obligation_Within_Ethical_Limits_Applied_to_Engineer_B,
case20:Loyalty_Obligation_of_Engineer_B_to_City_A ;
proeth:discoveredincase "20" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-25T16:24:12.880470+00:00" ;
proeth:firstdiscoveredincase "20" ;
proeth:generatedattime "2026-02-25T16:24:12.880470+00:00" ;
proeth:importance "medium" ;
proeth:obligatedparty "Engineer B" ;
proeth:obligationclass "Incumbent Engineer Faithful Performance Under Contested Contract Obligation" ;
proeth:obligationstatement "Engineer B was obligated to continue performing all consulting engineering services for City A faithfully, competently, and in the city's best interests throughout the final year of the active 3-year contract, notwithstanding the City Administrator's repeated questioning of Engineer B's professional judgment and the concurrent contract renewal competition in which Engineer C was participating." ;
proeth:sourcetext "Engineer B is currently hired under these contract terms and is in the final year of the 3-year contract." ;
proeth:temporalscope "Throughout the duration of the active 3-year contract, particularly during the final year when competitive and reputational pressures are heightened" ;
proeth:textreferences "Engineer B is currently hired under these contract terms and is in the final year of the 3-year contract.",
"The City Administrator has questioned the judgment of Engineer B on several occasions during the contract period." ;
proeth:wasattributedto "Case 20 Extraction" ;
prov:generatedAtTime "2026-02-25T16:36:27.859538"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 20 Extraction" .
Metadata
Extraction details
Discovered in case
20
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-25T16:24:12.880470+00:00
First case
20
Generated
2026-02-25T16:24:12.880470+00:00
Attributed to
Case 20 Extraction
Generated
2026-02-25T16:36:27.859538
Generated by
ProEthica Case 20 Extraction