Engineer B Active Contract During Engineer C Solicitation
S · State
Individual
http://proethica.org/ontology/case/20#Engineer_B_Active_Contract_During_Engineer_C_Solicitation
Properties
Instance of
IncumbentEngineerUnderActiveContractState
http://proethica.org/ontology/intermediate#IncumbentEngineerUnderActiveContractState
Active period
From the time Client A (City Administrator) contacted Engineer C through the point of the ethical analysis; contract not yet terminated
Affected parties
Client A (City Administrator)
Engineer B
Engineer C
Confidence
0.91
Importance
high
Subject
Engineer B's contractual relationship with Client A at the time of Engineer C's informal consultation
Terminated by
Not terminated within the case — Engineer B's contract remains active throughout
Triggering event
Client A solicited Engineer C's opinions about Engineer B's work while Engineer B remained under active contract
Urgency level
medium
Source Evidence
Source text
Engineer B is still under contract with Client A; the contract has not been terminated
Text references
Engineer B had no knowledge of Client A's conversation with Engineer C
Engineer B is still under contract with Client A; the contract has not been terminated
the Code states engineers in private practice shall not review the work of another engineer for the same client, except with the knowledge of such engineer, or unless the connection of such engineer with the work has been terminated
TTL
@prefix case20: <http://proethica.org/ontology/case/20#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case20:Engineer_B_Active_Contract_During_Engineer_C_Solicitation a proeth:IncumbentEngineerUnderActiveContractState,
owl:NamedIndividual ;
rdfs:label "Engineer B Active Contract During Engineer C Solicitation" ;
proeth:activeperiod "From the time Client A (City Administrator) contacted Engineer C through the point of the ethical analysis; contract not yet terminated" ;
proeth:affectedparties "Client A (City Administrator)",
"Engineer B",
"Engineer C" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.91" ;
proeth:discoveredincase "20" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "discussion" ;
proeth:firstdiscoveredat "2026-02-25T16:21:41.520751+00:00" ;
proeth:firstdiscoveredincase "20" ;
proeth:generatedattime "2026-02-25T16:21:41.520751+00:00" ;
proeth:importance "high" ;
proeth:sourcetext "Engineer B is still under contract with Client A; the contract has not been terminated" ;
proeth:stateclass "Incumbent Engineer Under Active Contract State" ;
proeth:subject "Engineer B's contractual relationship with Client A at the time of Engineer C's informal consultation" ;
proeth:terminatedby "Not terminated within the case — Engineer B's contract remains active throughout" ;
proeth:textreferences "Engineer B had no knowledge of Client A's conversation with Engineer C",
"Engineer B is still under contract with Client A; the contract has not been terminated",
"the Code states engineers in private practice shall not review the work of another engineer for the same client, except with the knowledge of such engineer, or unless the connection of such engineer with the work has been terminated" ;
proeth:triggeringevent "Client A solicited Engineer C's opinions about Engineer B's work while Engineer B remained under active contract" ;
proeth:urgencylevel "medium" ;
proeth:wasattributedto "Case 20 Extraction" ;
prov:generatedAtTime "2026-02-25T16:36:27.856632"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 20 Extraction" .
Metadata
Extraction details
Discovered in case
20
Discovered in pass
1
Discovered in section
discussion
First discovered
2026-02-25T16:21:41.520751+00:00
First case
20
Generated
2026-02-25T16:21:41.520751+00:00
Attributed to
Case 20 Extraction
Generated
2026-02-25T16:36:27.856632
Generated by
ProEthica Case 20 Extraction