MWC Decision to Proceed Without Concurrent Treatment
S · State
Individual
http://proethica.org/ontology/case/18#MWC_Decision_to_Proceed_Without_Concurrent_Treatment
Properties
Instance of
ClientAuthorityOverrideofSafetyRecommendationState
http://proethica.org/ontology/intermediate#ClientAuthorityOverrideofSafetyRecommendationState
Active period
From MWC meeting decision through regulatory approval and five-year implementation period
Affected parties
City M residents
Engineer B
MWC
State Department of the Environment
Confidence
0.92
Importance
critical
Subject
MWC's decision to proceed with water source change while deferring treatment
Terminated by
Not terminated within case facts
Triggering event
MWC vote to proceed with water source change but defer water treatment improvements
Urgency level
critical
Source Evidence
Source text
The MWC met and decided to proceed with the change in water source but to construct water treatment improvements at a later date.
Text references
The MWC met and decided to proceed with the change in water source but to construct water treatment improvements at a later date.
TTL
@prefix case18: <http://proethica.org/ontology/case/18#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case18:MWC_Decision_to_Proceed_Without_Concurrent_Treatment a proeth:ClientAuthorityOverrideofSafetyRecommendationState,
owl:NamedIndividual ;
rdfs:label "MWC Decision to Proceed Without Concurrent Treatment" ;
proeth:activeperiod "From MWC meeting decision through regulatory approval and five-year implementation period" ;
proeth:affectedparties "City M residents",
"Engineer B",
"MWC",
"State Department of the Environment" ;
proeth:conceptCategory "State" ;
proeth:confidence "0.92" ;
proeth:discoveredincase "18" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-25T15:06:43.155927+00:00" ;
proeth:firstdiscoveredincase "18" ;
proeth:generatedattime "2026-02-25T15:06:43.155927+00:00" ;
proeth:importance "critical" ;
proeth:sourcetext "The MWC met and decided to proceed with the change in water source but to construct water treatment improvements at a later date." ;
proeth:stateclass "Client Authority Override of Safety Recommendation State" ;
proeth:subject "MWC's decision to proceed with water source change while deferring treatment" ;
proeth:terminatedby "Not terminated within case facts" ;
proeth:textreferences "The MWC met and decided to proceed with the change in water source but to construct water treatment improvements at a later date." ;
proeth:triggeringevent "MWC vote to proceed with water source change but defer water treatment improvements" ;
proeth:urgencylevel "critical" ;
proeth:wasattributedto "Case 18 Extraction" ;
prov:generatedAtTime "2026-02-25T15:25:32.275882"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 18 Extraction" .
Metadata
Extraction details
Discovered in case
18
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-25T15:06:43.155927+00:00
First case
18
Generated
2026-02-25T15:06:43.155927+00:00
Attributed to
Case 18 Extraction
Generated
2026-02-25T15:25:32.275882
Generated by
ProEthica Case 18 Extraction