EngineerDoe_PublicHearingTestimonyCompleteness
O · Obligation
Individual
http://proethica.org/ontology/case/18#EngineerDoe_PublicHearingTestimonyCompleteness
Properties
Instance of
PublicHearingTestimonyCompletenessObligation
http://proethica.org/ontology/intermediate#PublicHearingTestimonyCompletenessObligation
Case context
Engineer presented at public hearing that industry would meet minimum water quality standards, unaware of factors recognized by Engineer Doe
Compliance status
unmet
Confidence
0.78
Importance
medium
Obligated party
Unaware Engineer (Public Hearing Design Engineer)
Obligation statement
The engineer who presented at the public hearing that the industry would meet minimum water quality standards was obligated to address all material technical concerns — including concerns about factors they were unaware of — and to qualify their testimony to reflect the limits of their knowledge, so that the public board's decision was based on complete and accurate engineering information.
Temporal scope
At the public hearing
Source Evidence
Source text
An engineer unaware of factors recognized by Engineer Doe who presented at a public hearing the view that the industry would meet minimum water quality standards.
Text references
An engineer unaware of factors recognized by Engineer Doe who presented at a public hearing the view that the industry would meet minimum water quality standards.
TTL
@prefix case18: <http://proethica.org/ontology/case/18#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case18:EngineerDoe_PublicHearingTestimonyCompleteness a proeth:PublicHearingTestimonyCompletenessObligation,
owl:NamedIndividual ;
rdfs:label "EngineerDoe_PublicHearingTestimonyCompleteness" ;
proeth:casecontext "Engineer presented at public hearing that industry would meet minimum water quality standards, unaware of factors recognized by Engineer Doe" ;
proeth:compliancestatus "unmet" ;
proeth:conceptCategory "Obligation" ;
proeth:confidence "0.78" ;
proeth:discoveredincase "18" ;
proeth:discoveredinpass "2" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-25T15:11:34.187959+00:00" ;
proeth:firstdiscoveredincase "18" ;
proeth:generatedattime "2026-02-25T15:11:34.187959+00:00" ;
proeth:importance "medium" ;
proeth:obligatedparty "Unaware Engineer (Public Hearing Design Engineer)" ;
proeth:obligationclass "Public Hearing Testimony Completeness Obligation" ;
proeth:obligationstatement "The engineer who presented at the public hearing that the industry would meet minimum water quality standards was obligated to address all material technical concerns — including concerns about factors they were unaware of — and to qualify their testimony to reflect the limits of their knowledge, so that the public board's decision was based on complete and accurate engineering information." ;
proeth:sourcetext "An engineer unaware of factors recognized by Engineer Doe who presented at a public hearing the view that the industry would meet minimum water quality standards." ;
proeth:temporalscope "At the public hearing" ;
proeth:textreferences "An engineer unaware of factors recognized by Engineer Doe who presented at a public hearing the view that the industry would meet minimum water quality standards." ;
proeth:wasattributedto "Case 18 Extraction" ;
prov:generatedAtTime "2026-02-25T15:25:32.284778"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 18 Extraction" .
Metadata
Extraction details
Discovered in case
18
Discovered in pass
2
Discovered in section
facts
First discovered
2026-02-25T15:11:34.187959+00:00
First case
18
Generated
2026-02-25T15:11:34.187959+00:00
Attributed to
Case 18 Extraction
Generated
2026-02-25T15:25:32.284778
Generated by
ProEthica Case 18 Extraction