ABC Engineers Consulting Engineering Firm
R · Role
Individual
http://proethica.org/ontology/case/18#ABC_Engineers_Consulting_Engineering_Firm
Definition
Consulting engineering firm employing Engineer B, retained by MWC for water supply project evaluation; discharged along with Engineer B following safety warnings
Properties
Instance of
Attributes
| type | Consulting engineering firm |
| client | City M / Metropolitan Water Commission |
Confidence
0.85
Importance
medium
Relationships
| type | client |
| target | City M |
| type | client |
| target | Metropolitan Water Commission |
| type | employer |
| target | Engineer B |
Role category
provider_client
Source Evidence
Source text
a consulting engineer with ABC Engineers
Text references
City M is a major client of ABC Engineers, through the MWC on water supply projects, and on other public works projects
The MWC discharged Engineer B and ABC Engineers from project involvement
a consulting engineer with ABC Engineers
TTL
@prefix case18: <http://proethica.org/ontology/case/18#> .
@prefix owl: <http://www.w3.org/2002/07/owl#> .
@prefix proeth: <http://proethica.org/ontology/intermediate#> .
@prefix prov: <http://www.w3.org/ns/prov#> .
@prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> .
@prefix xsd: <http://www.w3.org/2001/XMLSchema#> .
case18:ABC_Engineers_Consulting_Engineering_Firm a proeth:Provider-ClientRole,
owl:NamedIndividual ;
rdfs:label "ABC Engineers Consulting Engineering Firm" ;
proeth:attributes "{'type': 'Consulting engineering firm', 'client': 'City M / Metropolitan Water Commission'}" ;
proeth:caseinvolvement "Consulting engineering firm employing Engineer B, retained by MWC for water supply project evaluation; discharged along with Engineer B following safety warnings" ;
proeth:conceptCategory "Role" ;
proeth:confidence "0.85" ;
proeth:discoveredincase "18" ;
proeth:discoveredinpass "1" ;
proeth:discoveredinsection "facts" ;
proeth:firstdiscoveredat "2026-02-25T15:06:36.545992+00:00" ;
proeth:firstdiscoveredincase "18" ;
proeth:generatedattime "2026-02-25T15:06:36.545992+00:00" ;
proeth:importance "medium" ;
proeth:relationships "{'type': 'client', 'target': 'City M'}",
"{'type': 'client', 'target': 'Metropolitan Water Commission'}",
"{'type': 'employer', 'target': 'Engineer B'}" ;
proeth:rolecategory "provider_client" ;
proeth:roleclass "Provider-Client Role" ;
proeth:sourcetext "a consulting engineer with ABC Engineers" ;
proeth:textreferences "City M is a major client of ABC Engineers, through the MWC on water supply projects, and on other public works projects",
"The MWC discharged Engineer B and ABC Engineers from project involvement",
"a consulting engineer with ABC Engineers" ;
proeth:wasattributedto "Case 18 Extraction" ;
prov:generatedAtTime "2026-02-25T15:25:32.274013"^^xsd:dateTime ;
prov:wasGeneratedBy "ProEthica Case 18 Extraction" .
Metadata
Extraction details
Discovered in case
18
Discovered in pass
1
Discovered in section
facts
First discovered
2026-02-25T15:06:36.545992+00:00
First case
18
Generated
2026-02-25T15:06:36.545992+00:00
Attributed to
Case 18 Extraction
Generated
2026-02-25T15:25:32.274013
Generated by
ProEthica Case 18 Extraction