Engineer A Faithful Agent Impartial Role Execution BER 85-5

O · Obligation Individual
http://proethica.org/ontology/case/176#Engineer_A_Faithful_Agent_Impartial_Role_Execution_BER_85-5
Properties
Instance of
FaithfulAgentObligation
http://proethica.org/ontology/intermediate#FaithfulAgentObligation
Case context
The Owner retained Engineer A and the contract designated Engineer A as the initial dispute resolver; faithful agent duty required Engineer A to serve the Owner's genuine long-term interests through candid, accurate resolution rather than through a finding that could expose the Owner to collusion allegations or further disputes.
Compliance status
met
Confidence
0.95
Importance
high
Obligated party
Engineer A
Obligation statement
Engineer A was obligated to act as a faithful agent and trustee of the Owner by executing the contractually designated impartial interpreter role honestly and objectively, recognizing that faithful agency in this context required impartial performance rather than partisan advocacy.
Temporal scope
Throughout the construction-phase dispute resolution process
Source Evidence
Source text
Engineer A, seeks to remain impartial in the dispute, citing a provision in his contract with the Owner stating that the engineer is the initial interpreter of the requirements of the contract documents and judge of the acceptability of the work.

Text references
Engineer A, seeks to remain impartial in the dispute, citing a provision in his contract with the Owner stating that the engineer is the initial interpreter of the requirements of the contract documents and judge of the acceptability of the work.
Following his review, Engineer A agrees with the Contractor's position, noting that the Owner had approved certain changes in the work and that the Contractor complied with those changes.
TTL
@prefix case176: <http://proethica.org/ontology/case/176#> . @prefix owl: <http://www.w3.org/2002/07/owl#> . @prefix proeth: <http://proethica.org/ontology/intermediate#> . @prefix proeth-core: <http://proethica.org/ontology/core#> . @prefix prov: <http://www.w3.org/ns/prov#> . @prefix rdfs: <http://www.w3.org/2000/01/rdf-schema#> . @prefix xsd: <http://www.w3.org/2001/XMLSchema#> . case176:Engineer_A_Faithful_Agent_Impartial_Role_Execution_BER_85-5 a proeth:FaithfulAgentObligation, owl:NamedIndividual ; rdfs:label "Engineer A Faithful Agent Impartial Role Execution BER 85-5" ; proeth-core:competesWith case176:Engineer_A_Objectivity_in_Concrete_Pour_Dispute_Technical_Review ; proeth-core:defeasibleUnder <http://proethica.org/ontology/case/176#Engineer_A_Contractual_Impartiality_Obligation_—_Owner-Contractor_Concrete_Pour_Dispute> ; proeth:casecontext "The Owner retained Engineer A and the contract designated Engineer A as the initial dispute resolver; faithful agent duty required Engineer A to serve the Owner's genuine long-term interests through candid, accurate resolution rather than through a finding that could expose the Owner to collusion allegations or further disputes." ; proeth:compliancestatus "met" ; proeth:conceptCategory "Obligation" ; proeth:confidence "0.95" ; proeth:derivedFromPrinciple case176:Faithful_Agent_Duty_Correctly_Executed_By_Engineer_A_As_Impartial_Arbiter, case176:Faithful_Agent_Obligation_Bounded_by_Impartial_Role_Designation ; proeth:discoveredincase "176" ; proeth:discoveredinpass "2" ; proeth:discoveredinsection "facts" ; proeth:firstdiscoveredat "2026-03-01T11:01:01.705953+00:00" ; proeth:firstdiscoveredincase "176" ; proeth:generatedattime "2026-03-01T11:01:01.705953+00:00" ; proeth:importance "high" ; proeth:obligatedparty "Engineer A" ; proeth:obligationclass "Faithful Agent Obligation" ; proeth:obligationstatement "Engineer A was obligated to act as a faithful agent and trustee of the Owner by executing the contractually designated impartial interpreter role honestly and objectively, recognizing that faithful agency in this context required impartial performance rather than partisan advocacy." ; proeth:sourcetext "Engineer A, seeks to remain impartial in the dispute, citing a provision in his contract with the Owner stating that the engineer is the initial interpreter of the requirements of the contract documents and judge of the acceptability of the work." ; proeth:temporalscope "Throughout the construction-phase dispute resolution process" ; proeth:textreferences "Engineer A, seeks to remain impartial in the dispute, citing a provision in his contract with the Owner stating that the engineer is the initial interpreter of the requirements of the contract documents and judge of the acceptability of the work.", "Following his review, Engineer A agrees with the Contractor's position, noting that the Owner had approved certain changes in the work and that the Contractor complied with those changes." ; proeth:wasattributedto "Case 176 Extraction" ; prov:generatedAtTime "2026-03-01T11:13:16.197162"^^xsd:dateTime ; prov:wasGeneratedBy "ProEthica Case 176 Extraction" .
Metadata
Type
Individual
Last Updated
2026-05-28 16:27
Discovered in case
176
Discovered in pass
2
Discovered in section
facts
First discovered
2026-03-01T11:01:01.705953+00:00
First case
176
Generated
2026-03-01T11:01:01.705953+00:00
Attributed to
Case 176 Extraction
Generated
2026-03-01T11:13:16.197162
Generated by
ProEthica Case 176 Extraction